| Description: | REPAIRS AND REPLACEMENTS DUE TO FLOOD 2010 |
|---|---|
| Building: | LAGOMARCINO HALL |
| Requester: | VAN WYK, LOLA G |
| Work Order |
Description | Sold To | Billed Amount |
Pending Amount |
Total Amount |
Labor Hours |
|---|---|---|---|---|---|---|
| W889388 | ITS TO REMOVE AND RE-INSTALL MEDIA CABINET IN N0008 AT LAGO | 502-11-21 (unknown) |
$294.25 | $294.25 | 0 | |
| W889531 | INTRAMURAL FROM FP&M TO EHS | 502-11-21 (unknown) |
$4,561.41 | $4,561.41 | 0 | |
| W890348 | REPAIR AND PAINT WALL IN ROOM IN N0061 AND VARIOUS DOOR FRAMES | 502-11-21 (unknown) |
$6,246.99 | $6,246.99 | 98.2 | |
| W895367 | CLEAN UP DURING CONSTRUCTION | 502-11-21 (unknown) |
$74.90 | $74.90 | 2 | |
| W895480 | INSTALL PLYWOOD OVER ENDS OF 3 BASE CABINETS IN E0012 | 502-11-21 (unknown) |
$403.58 | $403.58 | 6.4 | |
| W891132 | CENTRAL STORES DELIVER BOXES AND TAPE TO 3 LOCATIONS | 502-11-21 (unknown) |
$232.08 | $232.08 | 0 | |
| W888426 | CONTRACTOR TO INSTALL FLOORING | 502-11-21 (unknown) |
$60,808.10 | $60,808.10 | 0 | |
| W888427 | AREA MECHANIC TO ASSIST AS NEEDED | 502-11-21 (unknown) |
$429.34 | $429.34 | 7.5 | |
| W891520 | PARKING FEES FOR CONTRACTOR | 502-11-21 (unknown) |
$385.20 | $385.20 | 0 | |
| W880387 | REPAIRS AND REPLACEMENTS DUE TO FLOOD 2010 | 502-11-21 (unknown) |
$4,173.02 | $4,173.02 | 52 | |
| W880591 | MM-LAGO-REPAIRS AND REPLACEMENTS DUE TO FLOOD 2010 | 502-11-21 (unknown) |
$3,583.97 | $3,583.97 | 42 | |
| W884808 | INSTALL PLASTIC OVER ADHESIVE ON FLOORS IN 0008, 0055, 0057 | 502-11-21 (unknown) |
$329.35 | $329.35 | 5.4 | |
| W881966 | JB LAGO-REPAIRS AND REPLACEMENTS DUE TO FLOOD 2010 | 502-11-21 (unknown) |
$636.66 | $636.66 | 7 | |
| W884683 | PURCHASE MATERIAL: FLOOD | 502-11-21 (unknown) |
$492.83 | $492.83 | 0 | |
| W886211 | CONTRACTOR TO REMOVE ASBESTOS FLOOR TILE AND MASTIC | 502-11-21 (unknown) |
$9,523.00 | $9,523.00 | 0 | |
| W886211 | CONTRACTOR TO REMOVE ASBESTOS FLOOR TILE AND MASTIC | 502-11-21-00-0000 (unknown) |
$2,984.50 | $2,984.50 | 0 | |
| W924584 | CAMPUS SERVICE REMOVE MULCH AND REGRADE | 502-11-21 (unknown) |
$5,671.18 | $5,671.18 | 139 | |
| W924589 | PHASE II: CLEAN DRAINS REPAIR STORM INLETS EXTEND 2" WATERLINE | 502-11-21 (unknown) |
$401.68 | $401.68 | 16.6 | |
| W924603 | PHASE II: PROJECT COORDINATOR, SCHEDULE WORK AS NEEDEDED | 502-11-21 (unknown) |
$1,203.75 | $1,203.75 | 15 | |
| W930745 | PHASE II: ADD CAP STONE TO 19 WINDOW WELLS | 502-11-21 (unknown) |
$6,179.25 | $6,179.25 | 0 | |
| W944082 | PHASE III: TAPE AND PAINT CORRIDOR REPAIRS | 502-11-21 (unknown) |
$467.11 | $467.11 | 7 | |
| W932845 | PHASE II: FP&M TO INSTALL WALL BASE GROUND FLOOR. | 502-11-21 (unknown) |
$5,951.23 | $5,951.23 | 84.1 | |
| W932850 | PHASE II: FP&M TO PAINT AS NEEDED IN CORRIDORS | 502-11-21 (unknown) |
$1,899.73 | $1,899.73 | 31.5 | |
| W938395 | PHASE III: CARPENTER REMOVE DRYWALL FOR WATER PROOF CONTRACTOR | 502-11-21 (unknown) |
$120.27 | $120.27 | 2 | |
| W974793 | PHASE III:INSTALL COVER OVER WINDOW WELLS: N0066,N0062,N0058,N0 | 502-11-21 (unknown) |
$4,440.50 | $4,440.50 | 0 | |
| Totals: | $121,493.88 | $0.00 | $121,493.88 | 515.7 | ||