| Requestor | COCHRAN, RONALD E |
|---|---|
| Alt Requestor | DANGELSER, BRIAN |
| Location | HOWE |
| Description | DESIGN AND REPLACE HEATING WATER SYSTEM |
| Details | Cost range will be provided ITEMS: HEATING/COOLING SYSTEM Design and replace heating water system. Brian is familiar with this issue. Been on going issue since construction of building. Because of flow issues reheat and radiaition pumps were combined. The heat exchangers were piped wrong and are eating away and need replaced. The issues with this system and its unrealability have caused numerous maint. issues and cost. This has been ongoing far to long and should be corrected ASAP. Location: HOWE HALL HEATING WATER CONVERTERS Desired completion date: NOVEMBER 2008 Known time constraints: Needs done ASAP Desired project cost: $10,000-25,000 Funding Contact: VAN WYK, LOLA G |
| Status | PROJECT REQUESTED - ASSIGNED TO REVIEW TEAM |
| Contact |
Lola Van Wyk 4-8313 |
| Const Start | |
| Const Due | 11/21/2008 |
Questions about this request should be directed to the FP&M Project Coordination Center.