Service Request #

SR213590 has been converted into Project PR012763.

Requestor COCHRAN, RONALD E
Alt Requestor DANGELSER, BRIAN
Location HOWE 
Description DESIGN AND REPLACE HEATING WATER SYSTEM 
Details Cost range will be provided
ITEMS: HEATING/COOLING SYSTEM
Design and replace heating water system.
Brian is familiar with this issue. Been on going issue since construction of building. Because of flow issues reheat and radiaition pumps were combined. The heat exchangers were piped wrong and are eating away and need replaced.
The issues with this system and its unrealability have caused numerous maint. issues and cost.
This has been ongoing far to long and should be corrected ASAP.

Location: HOWE HALL HEATING WATER CONVERTERS

Desired completion date: NOVEMBER 2008
Known time constraints: Needs done ASAP

Desired project cost: $10,000-25,000

Funding Contact: VAN WYK, LOLA G
Status PROJECT REQUESTED - ASSIGNED TO REVIEW TEAM
Contact Lola Van Wyk
4-8313
Const Start  
Const Due 11/21/2008 