Current Projects in Alumni Center

ALUMCTR- General-294172-Exterior Limestone Repair
On Hold
Room: General
Request date: 7/14/2023
Requested by: Michael Kepler
Contact: Melissa Warg
Construction start: 5/1/2024
Construction end: 10/30/2024
Description:
About 8-10yrs ago Nelson Construction was hired to build the 3rd Phase of our Alumni Donor wall on the east side of the building along the A2 parking lot. Lately we have had front edge limestone pieces that are adhered on and a few are coming loose so the adhesive is failing. One piece was glued back on last week by Country Landscapes but in the process it cracked in a couple spots and they don't necessarily want to be fixing these moving forward. I was hoping we could get a couple of these pieces from Nelson Construction or somewhere else to match and that way we have a spare piece or two plus I would like to replace the one that is cracked now as it doesn't look great. Please call my cell to discuss further 540.682.3359. Thanks!
ALUMCTR-3130-350935-Leak Repair
Construction Documents
Room: 3130
Request date: 3/29/2024
Requested by: Michael Kepler
Contact: John Byerly
Construction start: 5/16/2024
Construction end: 11/14/2024
Description:
Mente Boyd water leak at northeast corner window. Has been worked on a couple other times but still leaks.
ALUMCTR-General-316351-North Loading Dock Repairs
Bidding
Room: General
Request date: 10/11/2023
Requested by: Michael Kepler
Contact: Josef Biechler
Construction start: 5/1/2024
Construction end: 10/30/2024
Description:
Our loading dock on the north side has some concrete degradation we would like repaired and there is a small set of stairs that is coated with some kind of product to protect it. I've talked to Old School about this within the past few months and they said they could make the repairs and were the original installers of the stair coating. I would like to get this done before winter if possible. Thanks! Please contact Mike Kepler at 540-682-3359.
ALUMCTR-General-329316-Exterior Downspout Repair
Schematic Design
Room: General
Request date: 12/5/2023
Requested by: Michael Kepler
Contact: John Byerly
Construction start: 7/20/2024
Construction end: 1/18/2025
Description:
In the spring I would like to take a look at all of our downspouts coming off the roof of the boardroom and ballroom on the west side of the building. When I was cleaning them out this fall I noticed some joints where the caulking is wearing out or in some places completely gone and this might be contributing to some leaking we've had inside the building when we get hard rain. At least one drain is missing some metal flashing to direct the water away from the building that I would like to repair/replace as well. **This can be on hold until Spring. I just wanted to get a project opened so we can get on it first thing after winter.** Thanks!