Current Projects in Atanasoff Hall

ATANSFF-0101-324116-Remodel
Construction
Room: 0101
Request date: 11/21/2023
Requested by: Lorrie Ludwig
Contact: Brady Streit
Construction start: 4/17/2024
Construction end: 10/16/2024
Description:
We are looking at possibly remodeling this office over winter break. Needs some new ceiling tiles and some painting. Need an idea if this can be done during the break along with a cost estimate.
ATANSFF-0103-324115-Remodel
Project Closeout
Room: 0103
Request date: 11/21/2023
Requested by: Lorrie Ludwig
Contact: Leigh Wiand
Construction start:
Construction end:
Description:
We are looking at possibly remodeling this office over winter break. Needs some new ceiling tiles and some painting. Need an idea if this can be done during the break along with a cost estimate.
ATANSFF-0126-341974-Remodel
Project Closeout
Room: 0126
Request date: 2/7/2024
Requested by: Lorrie Ludwig
Contact: Leigh Wiand
Construction start:
Construction end:
Description:
Maybe they can introduce a motion-sensing light switch. The question about the loading dock (0127), whether it is possible to remodel it, and what (how much) it would take to remodel it is something that we will talk to FP&M about. Ideally, if they could remodel it in a way that combines spaces 0116B, 0126, 0126A, and 0126B and makes them accessible through one single access door that would improve both moving around the area and ease collaboration across both physical areas. I am not sure whether that ideal configuration is possible, but we can certainly inquire about it. This may tie in with request ID # 341526 2/29/24 Adding Scope Short wall removal: Lorrie will explore the possibility of removing the short walls in 0126B and arranging for carpet repairs afterward. Allocation of a part of 0127: Lorrie will investigate the feasibility of allocating a portion of 0127 to the Robotics Laboratory through remodeling, although this may entail significant costs. Use of faculty startup funds for renovation: Bowen, I authorize the use of your startup funds for lab renovations, as we have discussed.
ATANSFF-0226AA-337085-Whiteboard
Project Closeout
Room: 0226AA
Request date: 1/24/2024
Requested by: Lorrie Ludwig
Contact: Leigh Wiand
Construction start:
Construction end:
Description:
We need a whiteboard for this space. We already talked to Leigh Wiand about this and would like to have her get us a quote.
ATANSFF-B0004-331177-Office Remodel
Project Closeout
Room: B0004
Request date: 12/21/2023
Requested by: Lorrie Ludwig
Contact: Leigh Wiand
Construction start:
Construction end:
Description:
Full remodel to office using new standard paint, carpet, etc.
ATANSFF-B0007-316066-Carpet Replacement
Project Closeout
Room: B0007
Request date: 10/13/2023
Requested by: Lorrie Ludwig
Contact: Leigh Wiand
Construction start: 1/9/2024
Construction end: 4/17/2024
Description:
We would like to carpet B007 (Matthew Holman's office). I have been working with Jordan Babler on remodeling rooms in the basement at Atansoff. He requesteed a put in a work order and have it assigned to him. Worktag PG101473
ATANSFF-B0008-301819-Paint and Carpet
Project Closeout
Room: B0008
Request date: 8/11/2023
Requested by: Lorrie Ludwig
Contact: Leigh Wiand
Construction start: 8/28/2023
Construction end: 11/24/2023
Description:
We would like to get a quote for painting and carpeting this room (we already have the carpet squares). PG101473
ATANSFF-General-336641-Water Heater Study
Construction Documents
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Brian Grove
Construction start: 5/21/2024
Construction end: 11/19/2024
Description:
We would like to have the Engineering Team review the recently installed Water Heater for Code Compliance in the mechanical room and develop a detailed plan to correct any deficiencies found that could be shared with either a contractor or in-house staff. An engineering probable cost estimate would be appreciated.