Current Projects in Biorenewables Research Laboratory

BRL- General-300944-Lighting Standard Study
Schematic Design
Room: General
Request date: 8/4/2023
Requested by: Eric Zierke
Contact: Steve Larson
Construction start: 7/23/2024
Construction end: 1/21/2025
Description:
Lighting - much of the existing lighting at BRL uses Lutron ballasts. These are hard to find, very expensive, and we should be replacing them with something else. The existing lighting controller is very questionable. No one in the business wants to work on it and tech support over the phone for our staff is a joke. The shops would like the electrical engineering staff to take a look at the entire lighting system and decide how we want to replace failed components moving forward. Additional questions can be directed to Aaron Moses