Current Projects in Coover Hall

COOVER- General-171436-Grad Student Desks
Project Closeout
Room: General
Request date: 3/15/2022
Requested by: Lynne Dubert
Contact: Leigh Wiand
Construction start: 5/17/2023
Construction end: 8/25/2023
Description:
We would like to get an estimate on some basic grad student office desks. We are not sure if there are standard ones now, or how many we will be ordering, but we would like to discuss with someone about perhaps purshasing quite a few.
COOVER- General-246599-Repair or Replace Domestic Water Service
On Hold
Room: General
Request date: 12/15/2022
Requested by: John Netwal
Contact: Melissa Warg
Construction start: 5/17/2023
Construction end: 8/25/2023
Description:
The domestic water service at Coover Hall is showing signs of degradation and corrosion. Maintenance requires evaluation of the existing system as well as a scope and cost for replacementrepair.
COOVER- General-260249-Desks Replacement
Project Closeout
Room: General
Request date: 2/21/2023
Requested by: Lynne Dubert
Contact: Leigh Wiand
Construction start: 7/14/2023
Construction end: 4/17/2024
Description:
We would like to have someone come to Coover hall and look at some old desks as we would like to order some new ones for some staff members.
COOVER- General-302174-Faculty Desks
Project Closeout
Room: General
Request date: 8/15/2023
Requested by: Lynne Dubert
Contact: Leigh Wiand
Construction start: 10/27/2023
Construction end: 4/15/2024
Description:
Project Scope, would like to order 2 desks for faculty offices in Coover Hall.
COOVER-1129-356126-Faculty Office Furniture
Construction Documents
Room: 1129
Request date: 4/17/2024
Requested by: Lynne Dubert
Contact: Carrie Choudhury
Construction start: 7/3/2024
Construction end: 1/1/2025
Description:
We would like to order a new desk for this faculty member/office. Similar to the ones we had delivered in December. We would like a file cabinet, wire manager, and perhaps computer arms for the desk.
COOVER-3011-338417-Furniture and Paint
Construction
Room: 3011
Request date: 2/1/2024
Requested by: Lynne Dubert
Contact: Josef Biechler
Construction start: 3/13/2024
Construction end: 9/11/2024
Description:
We would like to order some desks, filing cabinets, and chairs for this space. We would also like to get a white board moved, as this project progresses, to a different wall. The wall that it is currently on MAY need to be painted. I assume we will need a designer to assist us with so much.
COOVER-3215-338256-Side Chairs
Project Closeout
Room: 3215
Request date: 1/30/2024
Requested by: Lynne Dubert
Contact: Josef Biechler
Construction start: 2/28/2024
Construction end: 4/24/2024
Description:
We would like to order 2 side chairs to match ones we received last year. I have photos from the tag on the chairs. I am not sure that I need a design cost range estimate, but did not know what else to check
COOVER-Room 1219-Create Three Offices
Schematic Design
Room: 1219
Request date: 8/13/2021
Requested by: Jeremy Bowker
Contact: John Byerly
Construction start: 9/2/2024
Construction end: 9/2/2024
Description:
My supervisor, Sara Harris, would like to schedule an in person meeting to discuss this room and sound proofing it. I think this is something they wanted to move quickly on. You can reach Sara at 294-1097, or me at 294-2664. Adding Scope: Creating Three offices in order to Soundproof