Current Projects in General Services Building

GEN SVC- 0195-265830-Remodel
Construction
Room: 0195
Request date: 3/8/2023
Requested by: Jared Hohanshelt
Contact: Eric Ohrt
Construction start: 12/5/2023
Construction end: 6/4/2024
Description:
We are wanting to remodel our office space and need some office furniture plans, lighting and paint.
GEN SVC- General-182825-Fire Alarm Reporting System
Schematic Design
Room: General
Request date: 4/19/2022
Requested by: Robert Currie
Contact: Mike McCoy
Construction start: 3/21/2025
Construction end: 9/19/2025
Description:
Indefinite scope consultant for feasibility study. Identify a fire alarm reporting system to replace the function metasys is doing now. Troy Carey with EH S and Christine Maduro can provide details, help answer questions. Use Account PG100365.
GEN SVC- General-238631-Electrical Charging Infrastructure for FPM Vehicles
Schematic Design
Room: General
Request date: 11/9/2022
Requested by: Paul Fuligni
Contact: Mike McCoy
Construction start: 7/21/2024
Construction end: 1/19/2025
Description:
Request use of indefinite quantity consultant to determine requirements and associated estimated costs to provide electrical charging infrastructure for future FPM, LSS and Postal university electric vehicles normally parked in Lot 47, other areas around General Services Building and Power Plant, and in FPM vehicle storage building and green tent. Include requirements for charging of future FPM Campus Services electric grounds maintenance and snow equipment and tools.
GEN SVC-0128-265811-Print Services for Office Walls
Construction Documents
Room: 0128
Request date: 3/8/2023
Requested by: Scott Jasper
Contact: Joseph Stoberl
Construction start: 5/27/2024
Construction end: 11/25/2024
Description:
Print Services for office walls
GEN SVC-0128-354903-Pipe Leak Repair
Bidding
Room: 0128
Request date: 4/3/2024
Requested by: Justin Abbott
Contact: Eric Ohrt
Construction start: 5/2/2024
Construction end: 10/31/2024
Description:
Insulated pipes are leaking in the bulkhead on the west side of this office space. Drywall will need to be removed to access the pipe and then inspect what is causing the leak. Repair leaking pipes, re-insulate pipes, re-install drywall, patch and paint.
GEN SVC-0195-361994-Remodel
Project Initiation
Room: 0195
Request date: 5/2/2024
Requested by: William Spratt
Contact: Jennifer Warrick
Construction start: 8/10/2024
Construction end: 2/8/2025
Description:
Relocate breakroom/conference room. Turn old breakroom into an office.
GEN SVC-General-336647-PRV Study
Project Closeout
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
We would like to have the Engineering Team review the recently installed 1" PRV for code compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be either shared with a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
GEN SVC-General-342488-Furniture & Paint
Cost Range Approval
Room: General
Request date: 2/14/2024
Requested by: Jennifer Fink
Contact: Melissa Warg
Construction start: 7/11/2024
Construction end: 1/9/2025
Description:
We would to see the options for furniture and paint for Jared and Lisa's offices. ATTN: Judy