Current Projects in Hixson-Lied Student Success Center

HIXSON-1020-266445-Remodel
Construction
Room: 1020
Request date: 3/15/2023
Requested by: Katherine-Rose Kanauss
Contact: Jennifer Warrick
Construction start: 12/8/2023
Construction end: 6/7/2024
Description:
We are working on redesigning this space into a low distraction testing room. We are looking for it to sit around 18 students of varying mobility ability. We have a testing space in our office (1200 J) that we would like to model the room after but need help in the planning and excecution of this project. Please feel free to call me for more details. The worktag we have included may change once we receive estimates and start to move forward with in process.
HIXSON-1060-355151-Remodel
Schematic Design
Room: 1060
Request date: 4/5/2024
Requested by: Josie Irwin
Contact: Steven Daniels
Construction start: 7/20/2024
Construction end: 1/18/2025
Description:
We are looking at updating our reception space in the main SAS office and wanted an opinion about what options there were for the space. Ideally, we would like to reuse most of the front desk, remove the unused section by the big windows, and add privacy pieces to the desk to hide the cords. We would also like to move the desk to the other side of the room, but it is a wired-in desk. We think the entire process would include repainting one of the walls, adding a decal to the wall, taking apart and moving the reception desk and wiring it in a different spot, getting additional privacy desk pieces, and potentially replacing the carpet as it may be unusable under the desk (but we are not sure).