Current Projects in Troxel Hall

TROXEL-1010-357962-Reupholstery Chairs
Schematic Design
Room: 1010
Request date: 5/2/2024
Requested by: Kathleen Baumgarn
Contact: Rebecca Cantrall
Construction start: 8/5/2024
Construction end: 2/3/2025
Description:
The upholstery on the backs of the chairs in the lobby has become very worn. The new upholstery - fabric or vinyl, needs to be very durable. Material with a variety of color would be nice. There are 24 seat backs that are in need of re-upholstery. I have visited with Rebecca about this project and am okay with the Intern working on this request, as I know how busy everyone is and this is not a rush project. Thank you! Katie B.
TROXEL-General-355031-Domestic Water Heater Study
Construction Documents
Room: General
Request date: 4/4/2024
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 7/11/2024
Construction end: 1/9/2025
Description:
Engineering review of the Domestic Water Heater and associated piping in Troxel for Code Compliance and safety. Mike McCoy, is familiar with some of the issues and I would like to have him take a closer look, develop a scope of work and cost range to bring this system into code and safety compliance to ISU standards. Please let me know if you have any questions.