Year Constructed:
2008
34,597 Gross Square Feet
| # |
Exemptions |
Summer |
Winter |
| 1 |
Entire Building |
Occupant will schedule and adjust setpoints. |
Occupant will schedule and adjust setpoints. |
| Unit |
Service Area |
Cool |
Heat |
System Type |
Summer Hours |
Winter Hours |
| ERV1 |
Ballroom |
|
|
Supply Fan
|
Scheduled by Occupant |
Scheduled by Occupant |
| ERV2 |
Entire Building |
|
|
Supply Fan
|
Scheduled by Occupant |
Scheduled by Occupant |
| HRP1 |
1st Floor - Heat Recovery Pumps (VHP, HHP) |
Yes |
Yes |
Unit Ventilator System with Reheat at the Point of Delivery
|
Scheduled by Occupant |
Scheduled by Occupant |
| CUH1 |
1st Floor - Cabinet Unit Heater (North Starwell and East Entrance) |
|
Yes |
Radiator
|
Fan is controlled by setpoint |
Fan is controlled by setpoint |
| EFT1 |
1st Floor - Fin Tude Heating (Rm-1105, Office suite, East) |
|
Yes |
Radiator
|
Controlled by setpoint only |
Controlled by setpoint only |
| HRP2 |
2nd Floor - Heat Recovery Pumps (HHP, VHP) |
Yes |
Yes |
Unit Ventilator System with Reheat at the Point of Delivery
|
Scheduled by Occupant |
Scheduled by Occupant |
| CUH2 |
2nd Floor - Cabinet Unit Heaters (North Stairwell and South Vestibule) |
|
Yes |
Radiator
|
Fan is controlled by setpoint |
Fan is controlled by setpoint |
| EFT2 |
2nd Floor - Fin Tube Heating (Rm 2105 - Office Suite - East) |
|
Yes |
Radiator
|
Controlled by setpoint only |
Controlled by setpoint only |
| HRP3 |
3rd Floor - Heat Recovery Pumps (HHP, VHP) |
Yes |
Yes |
Unit Ventilator System with Reheat at the Point of Delivery
|
Scheduled by Occupant |
Schedule by Occupant |
| CUH3 |
3rd Floor - Cabinet Unit Heater (3099 - North Stairwell) |
|
Yes |
Radiator
|
Fan is controlled by setpoint |
Fan is controlled by setpoint |
| EFT3 |
3rd Floor - Fin Tube Heaters (Rm 3105C-A - Alumni President) and (3130 - Loddy - windows up high) |
|
Yes |
Radiator
|
Controlled by setpoint only |
Controlled by setpoint only |
| Date |
Ex |
Energy Conservation Action(s) Taken |
| 12/2/2008 |
1 |
Occupant will schedule HVAC units and adjust setpoints as needed. |
| 5/11/2009 |
|
Reviewed for summer schedule. |
| 9/30/2009 |
|
Reviewed for winter schedule. |
Email:
Copyright © 2009, Iowa State University, all rights reserved.
www.fpm.iastate.edu/utilities/bldg_energy_plans/building.asp