Armory

Year Constructed: 1924 / 1941

89,563 Gross Square Feet

# Exemptions Summer Winter
1 Design Studio Space 24/7  24/7 
2 (FC1) Operate DPS Occupied Areas (rooms 55, 162, 166, & 168) 24/7   24/7 


Unit Service Area Cool Heat System Type Summer Hours Winter Hours
AHU1 SW Floor and bleachers    Yes  Constant Volume   24/7  24/7 
AHU2 Room 163 - Old Rifle Range    Yes  Constant Volume   Unit not used
24/7 = off 
Unit not used
24/7 = off 
AHU3 East Floor, NE bleachers    Yes  Constant Volume   24/7  24/7 
AHU4 Main Floor, NE Bleachers    Yes  Constant Volume   24/7  24/7 
AHU5 West side of Building  Yes  Yes  Mixed Air HVAC System   Local Control  Local Control 
FC1 Rooms 100,104,141 Fan Coil Unit control - Group 1, 2, 3  Yes  Yes  Fan Coil Unit with Occupant Thermostat   Room Scheduling  Room Scheduling 
AHU6 Navy and Army rooms 1st and 2nd floor East side  Yes  Yes  Mixed Air HVAC System   24/7  24/7
 


Unit Service Area Control Strategies
AHU1  SW Floor and bleachers  Fan cycles based on outdoor air temperature (@ 50 degrees) and inside space temperature (room 86 @ 68 degrees)
AHU2  Room 163 - Old Rifle Range  Unit not used
AHU3  East Floor, NE bleachers  Fan cycles based on outdoor air temperature @ 0 degrees
AHU4  Main Floor, NE Bleachers  Fan cycles based on outdoor air temperature (@ 50 degrees) and inside space temperature (room 86 @ 68 degrees)
AHU5  West side of Building  Local thermostats @ 70 degrees
FC1  Rooms 100,104,141 Fan Coil Unit control - Group 1, 2, 3  Local thermostats @ 70 degrees during heating season and 76 degrees during the cooling season
AHU6  Navy and Army rooms 1st and 2nd floor East side  pending completion: 100% ODA mixed air unit supplies 23 rooms on east side with a minimum of fresh air. Independant damper control switches from 100%ODA to 100%Open area when unoccupied. Preheat to 52 Degrees, Cool to 55Degrees, Rehear to 70 Degrees.


Date Ex Energy Conservation Action(s) Taken
3/17/2006 Design Center Space = complete
3/20/2006 FC1 = complete
7/7/2006   Completed MEA Holiday schedules and reviewed hours of operation
10/30/2006   Reviewed for winter settings = Off-line = Metasys controls are being updated
5/9/2007   Reviewed for summer settings.
11/1/2007   Reviewed for winter schedule
5/15/2008   Reviewed for summer schedule.
9/8/2008   Reviewed for winter schedule.
9/30/2009   Reviewed for winter schedule.


Facilities Planning & Management
Email: FP&M Web Services
Go to ISU homepage
Copyright © 2009, Iowa State University, all rights reserved.
www.fpm.iastate.edu/utilities/bldg_energy_plans/building.asp