ISU Facilities

Building Energy Plans

Bergstrom Indoor Training Facility

Year Constructed: 2004

88,195 Gross Square Feet

# Exemptions Summer Winter


Unit Service Area Cool Heat System Type Summer Hours Winter Hours
AHU1 football practice field = return air heating setpoint    Yes  Forced air furnace   Return air temperature
heating enable setpoint
Day = 60deg; Night = 50deg

Mon=7am-10pm (60 deg)
Tue=7am-10pm (60 deg)
Wed=7am-10pm (60 deg)
Thu=7am-10pm (60 deg)
Fri=7am-6pm (60 deg)
Sat=7am-10pm (60 deg)
Sat=7am-10pm (60 deg)
Holidays? 
Return air temperature
heating enable setpoint
Day = 60deg; Night = 50deg

Mon=7am-10pm (60 deg)
Tue=7am-10pm (60 deg)
Wed=7am-10pm (60 deg)
Thu=7am-10pm (60 deg)
Fri=7am-6pm (60 deg)
Sat=7am-10pm (60 deg)
Sat=7am-10pm (60 deg)
Holidays? 
AHU1 football practice field = start / stop    Yes  Forced air furnace   Outdoor air temperature
setpoint enables fan to
start/stop. Set for 60F 
Outdoor air temperature
setpoint enables fan to
start/stop. Set for 60F 


Date Ex Energy Conservation Action(s) Taken
10/31/2006   Reviewed for winter settings
5/9/2007   Reviewed for summer schedule.
11/1/2007   Reviewed for winter schedule
5/15/2008   Reviewed for summer schedule.
5/11/2009   Reviewed for summer schedule.
9/30/2009   Reviewed for winter schedule.


Facilities Planning & Management
Email: FP&M Web Services
Go to ISU homepage
Copyright © 2009, Iowa State University, all rights reserved.
www.fpm.iastate.edu/utilities/bldg_energy_plans/building.asp