Building Energy Plans

Coover Hall

Year Constructed: 1950 / 1959 / 2007

111,363 Gross Square Feet

Coover Hall All Floor - HVAC

Coover Hall Basement Floor Plan - HVAC

Coover Hall First Floor Plan - HVAC

Coover Hall Second Floor Plan - HVAC

Coover Hall Third Floor Paln - HVAC

Coover Hall Fourth Floor Plan - HVAC

# Exemptions Summer Winter
1 Rm 2424, 2421 - server rooms (AHU2) 24/7 @ 72 degrees  24/7 @ 72 degrees 
2 Rm 1212, 1125, 1208, 1301, 1316, 1318, 1331, 1331C, 1341 - Open Lab hours (AHU8, AHU9) Hours vary for academic year vs summer  Hours vary for academic year vs summer 
3 (AHU8) Room 1331 dept. Sever room 72 Deg 24/7  72 Deg 24/7 
4 (AHU12) Rms 2011,2014,2018,2042,2046,2048,2050,2061,2041 24/7 operation thru June 09  24/7 operation thru June 09 
5 Room 1060 71.5 deg 8AM to 8PM April 2012 thru Dec 2015   


Unit Service Area Cool Heat System Type Summer Hours Winter Hours
AHU6 Auditorium 2245  Yes  Yes  Mixed Air HVAC System   Run = 24/7  Room Scheduling 
AHU8 Grahics/Computer Rooms 1331, 1331C, 1341, Server Room  Yes  Yes  HVAC System with Reheat   ON 24/7  ON 24/7 
AHU9 Learning Center - Room 1313  Yes  Yes  HVAC System with Reheat  
Mon=6am-5pm
Tue=6am-5pm
Wed=6am-5pm
Thu=6am-5pm
Fri=6am-5pm
Sat=6am-5pm
Off=Sun
Off=Holidays 

Mon=6am-2am
Tue=6am-2am
Wed=6am-2am
Thu=6am-2am
Fri=7am-8pm
Sat=10am-8pm
Sun=10am-2am
Holidays=OFF
Winter = OFF 24/7 
FCU1212 Computer Lab 1212  Yes    Fan Coil Unit with Occupant Thermostat   Occupant Controlled  Occupant Controlled 
FCU1301 Computer Lab 1301  Yes    Fan Coil Unit with Occupant Thermostat   Occupant Controlled  Occupant Controlled 
FCU1318 Computer Lab 1318  Yes    Fan Coil Unit with Occupant Thermostat   Occupant Controlled  Occupant Controlled 
AH11 1st Floor  Yes  Yes  Mixed Air HVAC System   Run = 24/7  Run = 24/7 
AH12 2nd and 3rd Floor  Yes  Yes  Mixed Air HVAC System   Run = 24/7  Run = 24/7 
LTG1 Stand alone Lighting Panel in Room #: Serves: ?      Lighting Control  
EXH-RR Rest rooms      Exhaust Fan   All days 6am-10pm  All days 6am-10pm 


Unit Service Area Control Strategies
    Thermostat set at 70-degrees all year. Cooling controlled by a duct temperature sensor for 76-degree return air. Heating controlled by thermostat and reheat coils in VAV boxes. Room temperature will naturally fluctuate between 70 degrees and 76 degrees depending on outside air temperature and heat load in the area served. During “off” periods there will be an 80-degree upper limit and a 65-degree lower limit.
    Thermostat set at 70-degrees all year. Cooling controlled by a duct temperature sensor for 76-degree return air. Heating controlled by thermostat and reheat coils in VAV boxes. Room temperature will naturally fluctuate between 70 degrees and 76 degrees depending on outside air temperature and heat load in the area served. During “off” periods there will be an 80-degree upper limit and a 65-degree lower limit.
AHU6  Auditorium 2245  Zone thermostat set at 71-degrees all year. Cooling/Heating controlled by a supply air temperature sensor for for a range of 55F-95F degrees reset schedule base on zone set point. During “off” periods there will be an 80-degree upper limit and a 65-degree lower limit.
AHU8  Grahics/Computer Rooms 1331, 1331C, 1341, Server Room  Thermostat set at 70-degrees all year. Cooling controlled by a duct temperature sensor for 76-degree return air. Heating controlled by thermostat and reheat coils in VAV boxes. Room temperature will naturally fluctuate between 70 degrees and 76 degrees depending on outside air temperature and heat load in the area served. During “off” periods there will be an 80-degree upper limit and a 65-degree lower limit.
AHU9  Learning Center - Room 1313  Thermostat set at 70-degrees all year. Cooling controlled by a duct temperature sensor for 76-degree return air. Heating controlled by thermostat and reheat coils in VAV boxes. Room temperature will naturally fluctuate between 70 degrees and 76 degrees depending on outside air temperature and heat load in the area served. During “off” periods there will be an 80-degree upper limit and a 65-degree lower limit.
LTG1  Stand alone Lighting Panel in Room #: Serves: ?  ?


Date Ex Energy Conservation Action(s) Taken
7/11/2006   Completed MEA Holiday schedules and reviewed hours of operation
7/11/2006   Domestic Hot Water pump scheduled On/Off, Day/Night, 7/1600
10/30/2006   Reviewed for winter schedule
5/10/2007   Reviewed for summer schedule
11/1/2007   Reviewed for winter schedule
4/25/2008 AHU8 = Run =24/7 = lowered supply air setpoint from 60F to 55F degrees (Stan)
5/20/2008   Reviewed for summer schedule
8/28/2008 AHU12 = Run =24/7
5/12/2009   Reviewed for summer schedule
10/1/2009   Reviewed for winter schedule.
5/12/2010   Reviewed for summer schedule
5/12/2010   Reviewed for summer schedule
8/27/2012   Run AHU6, 24/7 for summer months. See Building Energy System Notes below. (Stan, Ron and Wendy)
9/24/2012   AHU-6: Returned to normal schedule.