| # | Exemptions | Summer | Winter |
|---|---|---|---|
| 1 | Video/TV Studios Rms 1145, 1147, 1147A, 1147B, 1151 (AHU2) | 74 degrees | 72 degrees |
| 2 | Room 1104 | 70 degrees 7:30 am to 5:00pm |
| Unit | Service Area | Cool | Heat | System Type | Summer Hours | Winter Hours |
|---|---|---|---|---|---|---|
| AHU1 | Offices 1112-1118, 1185-1189; Conf Rms 1114, 1110, 1183, 1181; Library; 1159; Also 1159, 1104, 1142 | Yes | Yes | VAV with Reheat | Run = 7am - 6pm, Mon Run = 7am - 6pm, Tue Run = 7am - 6pm, Wed Run = 7am - 6pm, Thu Run = 7am - 6pm, Fri Off = Sat Off = Sun Off = Holidays |
Run = 7am - 6pm, Mon Run = 7am - 6pm, Tue Run = 7am - 6pm, Wed Run = 7am - 6pm, Thu Run = 7am - 6pm, Fri Off = Sat Off = Sun Off = Holidays |
| AHU2 | Conf Rm 1020, 1141, Wow Center, Radio/TV Studios 1145-1151 | Yes | Yes | VAV with Reheat | Run = 7am - 6pm, Mon Run = 7am - 6pm, Tue Run = 7am - 6pm, Wed Run = 7am - 6pm, Thu Run = 7am - 6pm, Fri Off = Sat Off = Sun Off = Holidays |
Run = 7am - 6pm, Mon Run = 7am - 6pm, Tue Run = 7am - 6pm, Wed Run = 7am - 6pm, Thu Run = 7am - 6pm, Fri Off = Sat Off = Sun Off = Holidays |
| Unit | Service Area | Control Strategies |
|---|---|---|
| AHU1 | Offices 1112-1118, 1185-1189; Conf Rms 1114, 1110, 1183, 1181; Library; 1159; Also 1159, 1104, 1142 | Thermostat set at 70-degrees all year. Cooling controlled by a duct temperature sensor for 76-degree return air. Heating controlled by thermostat and reheat coils in VAV boxes. Room temperature will naturally fluctuate between 70 degrees and 76 degrees depending on outside air temperature and heat load in the area served. During “off” periods there will be an 80-degree upper limit and a 65-degree lower limit. |
| AHU2 | Conf Rm 1020, 1141, Wow Center, Radio/TV Studios 1145-1151 | Thermostat set at 70-degrees all year. Cooling controlled by a duct temperature sensor for 76-degree return air. Heating controlled by thermostat and reheat coils in VAV boxes. Room temperature will naturally fluctuate between 70 degrees and 76 degrees depending on outside air temperature and heat load in the area served. During “off” periods there will be an 80-degree upper limit and a 65-degree lower limit. |
| Date | Ex | Energy Conservation Action(s) Taken |
|---|---|---|
| 3/20/2006 | 1 | (AHU2) Video Studios Rms 1145, 1147, 1147A, 1147B, 1151= complete |
| 7/12/2006 | Completed MEA Holiday schedules and reviewed hours of operation | |
| 10/30/2006 | Reviewed for winter schedule | |
| 12/19/2006 | 2 | Update completed. See information under Building Energy System Notes Dated 12/19/06 |
| 5/10/2007 | Reviewed for summer schedule | |
| 11/1/2007 | Reviewed for winter schedule | |
| 5/21/2008 | Reviewed for summer schedule. | |
| 9/15/2008 | Reviewed for winter schedule. | |
| 5/5/2009 | Reviewed for summer schedule | |
| 10/7/2009 | Reviewed for winter schedule. |