Year Constructed:
1925 / 1961 / 1969 / 1983
325,488 Gross Square Feet
| # |
Exemptions |
Summer |
Winter |
| 1 |
1st, 2nd, 3rd floor addition (AHU1, 2, 3, 4, 5, 6) |
24/7 at 70 degrees |
24/7 at 69 degrees |
| 2 |
Special collections, AHU7 |
24/7 at 70 degrees |
24/7 at 68 degrees |
| 3 |
Room 117 (AHU9) (Not required supplemental air) |
off 24/7 |
off 24/7 |
| 4 |
Room 005 Film Vault, DX Unit |
24/7 at 65 degrees |
24/7 at 65 degrees |
| 5 |
Room 441Preservation Lab |
24/7 at 65 degrees |
24/7 at 65 degrees |
| 6 |
Room 074 Computer servers |
24/7 at 70 degrees |
24/7 at 68 degrees |
| 7 |
Entire Building |
24/7 at 70 degrees |
24/7 at 68 degrees |
| Unit |
Service Area |
Control Strategies |
| AHU1 |
First Addition |
Summer = Local thermostats at 70 degrees
Winter = Local thermostats at 68 degrees
During “off” periods there will be an 83-degree upper limit and a 63-degree lower limit. |
| AHU2 |
First Addition |
Summer = Local thermostats at 70 degrees
Winter = Local thermostats at 68 degrees
During “off” periods there will be an 83-degree upper limit and a 63-degree lower limit. |
| AHU3 |
Second Addition |
Summer = Local thermostats at 70 degrees
Winter = Local thermostats at 68 degrees
During “off” periods there will be an 83-degree upper limit and a 63-degree lower limit. |
| AHU4 |
Second Addition |
Summer = Local thermostats at 70 degrees
Winter = Local thermostats at 68 degrees
During “off” periods there will be an 83-degree upper limit and a 63-degree lower limit. |
| AHU5 |
Third Addition - 3rd Floor |
Summer = Local thermostats at 70 degrees
Winter = Local thermostats at 68 degrees
During “off” periods there will be an 83-degree upper limit and a 63-degree lower limit. |
| AHU6 |
Third Addition - 2nd Floor |
Summer = Local thermostats at 70 degrees
Winter = Local thermostats at 68 degrees
During “off” periods there will be an 83-degree upper limit and a 63-degree lower limit. |
| AHU7 |
Special Collections |
Summer = Local thermostats at 70 degrees
Winter = Local thermostats at 68 degrees |
| AHU9 |
Old Copy Room |
Off
During “off” periods there will be an 80-degree upper limit and a 65-degree lower limit. |
| DX |
Third Addition - Basement, Book Storage |
Summer = Local thermostats at 70 degrees
Winter = Local thermostats at 68 degrees |
| Liebert |
Third Addition |
Occupant Controlled - not on Metasys |
| Date |
Ex |
Energy Conservation Action(s) Taken |
| 5/17/2006 |
7 |
Entire Building |
| 5/17/2006 |
6 |
Room 074 Computer servers = complete |
| 5/17/2006 |
5 |
Room 441Preservation Lab = complete |
| 5/17/2006 |
4 |
Dx Unit Room 005 Film Vault = complete |
| 5/17/2006 |
3 |
AHU9 Room 117 (Not required supplemental air) = complete |
| 5/17/2006 |
2 |
AHU7 = complete |
| 5/17/2006 |
1 |
AHU1, 2, 3, 4, 5, 6 = complete |
| 6/23/2006 |
|
COMPLETED SPRING 06 BUILDING ENERGY CONSERVATION SETTINGS |
| 7/17/2006 |
|
Completed MEA Holiday schedules and reviewed hours of operation |
| 10/31/2006 |
|
Reviewed for winter schedule |
| 5/11/2007 |
|
Reviewed for summer schedule |
| 9/22/2008 |
|
Reviewed for winter schedule. |
| 5/14/2009 |
|
Reviewed for summer schedule. |
| 10/9/2009 |
|
Reviewed for winter schedule; |
Email:
Copyright © 2009, Iowa State University, all rights reserved.
www.fpm.iastate.edu/utilities/bldg_energy_plans/building.asp