| # | Exemptions | Summer | Winter |
|---|---|---|---|
| 1 | (AHU1) Production areas - 24/7 operation | 24/7 | 24/7 |
| 2 | (AHU3) Publications area | 24/7 | 24/7 |
| Unit | Service Area | Cool | Heat | System Type | Summer Hours | Winter Hours |
|---|---|---|---|---|---|---|
| AHU1 | Production area | Yes | Yes | Mixed Air HVAC System | 24/7 | 24/7 |
| AHU2 | West Offices | Yes | Yes | Mixed Air HVAC System | Run = 7am – 6pm, Mon Run = 6am – 6pm, Tue Run = 6am – 6pm, Wed Run = 6am – 6pm, Thu Run = 6am – 6pm, Fri Off =Sat Off = Sun Off = Holidays |
Run = 7am – 6pm, Mon Run = 6am – 6pm, Tue Run = 6am – 6pm, Wed Run = 6am – 6pm, Thu Run = 76am – 6pm, Fri Off =Sat Off = Sun Off = Holidays |
| AHU3 | Publications area | Yes | Yes | Mixed Air HVAC System | 24/7 | 24/7 |
| AHU4 | North Warehouse | Yes | DX Unit | Occupant Controlled | Occupant Controlled |
| Unit | Service Area | Control Strategies |
|---|---|---|
| AHU1 | Production area | Local thermostat @ 76 degrees in the summer and 70 degrees in the winter. |
| AHU2 | West Offices | Local thermostat @ 76 degrees in the summer and 70 degrees in the winter. 83 degrees upper limit summer, 63 degrees lower limit winter. |
| AHU3 | Publications area | Local thermostat @ 76 degrees in the summer and 70 degrees in the winter. |
| AHU4 | North Warehouse | Local control |
| Date | Ex | Energy Conservation Action(s) Taken |
|---|---|---|
| 4/21/2006 | The Spring 2006 Energy Conservation Settings have been completed for your building. | |
| 4/21/2006 | 2 | AHU3 = complete |
| 4/21/2006 | 1 | AHU1 = complete |
| 7/17/2006 | Completed MEA Holiday schedules and reviewed hours of operation | |
| 10/31/2006 | Reviewed for winter schedule | |
| 11/2/2007 | Reviewed for winter schedule | |
| 5/22/2008 | Reviewed for summer schedule. | |
| 9/22/2008 | Reviewed for winter schedule. | |
| 5/14/2009 | Reviewed for summer schedule. | |
| 10/9/2009 | Reviewed for winter schedule |