48 active work orders

Request # & Date Description Status
SR465090
05/11/2020
Repair, Replace, Install ; Back Flows and Piping as NeededScheduled
Billing Info
SR473274
10/27/2020
Replace Fittings Around Bottom Prv StationCompleted
Billing Info
SR473508
11/02/2020
North Condensate Pit Is Blowing off a Lot of SteamCompleted
Billing Info
SR474612
11/24/2020
Moly BioScheduled
Billing Info
SR474614
11/24/2020
Ahu-5 Moly BioScheduled
Billing Info
SR474615
11/24/2020
Ah-6 Moly BioAwaitmatls
SR474991
12/08/2020
Add Ups to Main Metasys Components to Prevent Failure of DevicesOpen
Billing Info
SR476900
01/28/2021
Vfd16 Is Not WorkingOpen
Billing Info
SR477215
02/05/2021
Condensate Alarm in Panel NCompleted
Billing Info
SR478195
02/24/2021
Ahu7, Steam Leak on North Side of CoilOpen
SR478442
03/02/2021
Make Repairs to 4" Strainer on Steam MainCompleted
Billing Info
SR479030
03/15/2021
Repairs in Sewer PitScheduled
Billing Info
SR479211
03/18/2021
Exhaust Shives & Motor Replacement - 4 UnitsScheduled
SR479560
03/26/2021
Cw1, Chw-Diff, Cw Water Differential Is Unreliable.Open
SR479588
03/26/2021
Repair Relay in Fire Alarm PanelOpen
Billing Info
SR480043
04/06/2021
Steam Heating Control Valve Is Not Closing CompletelyOpen
Billing Info
SR480335
04/13/2021
Install a New 1/2" Copper Pipe Vacuum LineCompleted
Billing Info
SR480643
04/20/2021
Seal Around Condensate LinerScheduled
SR480773
04/22/2021
Heat in This Office Is Not WorkingOpen
SR480801
04/23/2021
Rm 1160A, Low Flow-Hood 081157 Face Velocity Is 17 FPMCompleted
Billing Info
SR480802
04/23/2021
Room 1236, Hood 080766 Face Velocity Is 33 FPM, Low FlowCompleted
Billing Info
SR480803
04/23/2021
Room 0213D, Hood 080766 Face Velocity Is 25 FPM-Low FlowHold
Billing Info
SR480804
04/23/2021
Room 0231G, Hood 080766 Face Velocity Is 162 FPM - Too HighCompleted
Billing Info
SR480972
04/27/2021
Ahu5, Supply Line to Chilled Water Coil Is Leaking BadOpen
SR480981
04/27/2021
Freight Elevator Makes Humming/Crank Noise for 15-20 SecondsOpen
Billing Info
SR481037
04/28/2021
Fume Hood 81128 Has Low Flow, Hef151, Room 114Completed
Billing Info
SR481038
04/28/2021
Hood 80853 Has Low Flow, Hef253 West Hood Rm 1227Completed
Billing Info
SR481039
04/28/2021
Hood 80768 Has Low Flow, Hef211 West Hood Room 1237Completed
Billing Info
SR481158
04/30/2021
Add Standalone Ad-200 Electronic LocksOpen
Billing Info
SR481593
05/11/2021
Di Water System Will Not Run Without Overrides in MetasysCompleted
Billing Info
SR481596
05/11/2021
Resolve Eye Wash Flow Sensor in Alarm in MetasysOpen
Billing Info
SR481615
05/11/2021
Clean Carpet in This Office After Room Has Been RepaintedAssigned
SR481751
05/13/2021
West Wall, Greenhouse Glass Has Slid DownAwaitmatls
Billing Info
SR482432
05/26/2021
Hxu1 and 2 Are No Longer Producing Cold Enough WaterOpen
SR482437
05/26/2021
Room Is Too HotOpen
Billing Info
SR482507
05/27/2021
Build Platform over Piping for Access to ValvesOpen
Billing Info
SR482574
05/28/2021
Autoclave in This Room Gets Stuck in Middle of a CycleOpen
SR483128
06/09/2021
Fume Hood In#080827 Has a Face Velocity of 32 F.P.M.Open
SR483170
06/10/2021
Call Back - Leak from Ceiling in Hallway near Rm 1184Open
Billing Info
SR483245
06/11/2021
Warm Room Has Shut down and Is Not WorkingOpen
SR483247
06/11/2021
Women's Restroom Sink PluggedOpen
SR483257
06/11/2021
Fume Hood 081158 Has a Face Velocity of 27 F.P.M.Open
SR483258
06/11/2021
Fume Hood 081159 Has a Face Velocity of 23 F.P.M.Open
SR483260
06/11/2021
Fume Hood 080840 Has a Face Velocity of 24 F.P.MOpen
SR483497
06/16/2021
Investigate Roof Water Leaks on East SideOpen
SR483549
06/17/2021
Maintenance:Open
SR483589
06/18/2021
Repair/Replace Gfi OutletOpen
SR483593
06/18/2021
Doors 2188 & 2192 Are Not OpeningOpen

10 active small projects

Request # & Date Description Status
12/31/2019
Rms 112 & 114 - RemodelSupport
05/12/2020
Rm M0142 - Install Machine Room VentilationComplete
01/22/2021
Room M0240 - Replace Sump Pit with Condensate TankDesign
01/29/2021
Redesign Failing Floor Tile SystemClientrvw
02/02/2021
Replace Chilled Water Coil Valves on AHUs -5 and 6Complete
03/08/2021
Room 3116 - FurnitureScheduled
03/30/2021
Room 1228 - Painting and CarpetComplete
04/08/2021
Room 2328 - Lighting & ElectricalDesign
04/22/2021
Room 302 - RemodelEstimating
06/14/2021
Room 1320C - CarpetOpen

1 active capital project

Capital Project # & Date Description Status
CP002714
07/08/2020
Molecular Biology Building-Ahu7-Coil ReplacementActive