Date | WO # | Location | Description | Requester | Status |
---|---|---|---|---|---|
7/14/2021 | 97381 | COM BDG | WG49844 - AT&T/VERIZON CELL TOWER EQUIPMENT UPGRADE 2019 WORK | Randolph Larabee | Open |
7/14/2021 | 97385 | COM BDG | WH02936 - AT&T LEASE UPDATE-COMMUNICATIONS BUILDING | Randolph Larabee | Open |
7/14/2021 | 97386 | COM BDG | VERIZON LEASE UPDATE-COMMUNICATIONS BUILDING | Randolph Larabee | Open |
4/3/2023 | 272166 | COM BDG | call back-heating water pump #4-5 alarm, | DPS dispatch DPS | Assigned |
4/12/2023 | 273021 | COM BDG | Center south door, interior ceiling heat curtain blowing hot air. | Mark Wyant | Open |
11/21/2023 | 324154 | GENERAL COM BDG | Call back Friday 18th from DPS AHU-7 in alarm | DPS dispatch DPS | Assigned |
8/6/2024 | 381749 | 2046 COM BDG | The air conditioning does not seem to be functioning properly in room 2046 nor is the air circulating. The room is too warm and stuffy. The ceiling vents do not seem to be putting air out in any of the offices in the space (suite 2040). Additional location information: Suite 2040 | Sara Jensen | Assigned |
9/5/2024 | 389311 | COM BDG | Flush/change coolant | Anthony Gervais | Open |
9/23/2024 | 390865 | 1135 COM BDG | Give to a painter. Repair and paint the ceiling in the display case at Communications, public corridor 1135. Mold has been killed, and stains are left. | Gail Koobs | Assigned |
10/3/2024 | 396021 | COM BDG | Hire HM Cragg to Replace PCB Board, Replace Serpentine Belt. Assign to Anthony Gervais | Anthony Gervais | Assigned |
1/21/2025 | 416333 | 1021 COM BDG | The mag hold opens for the internal doors are not working which locked those of us in the 1021 end of the building out of the rest of the building. This includes the bathrooms and our networking closet. | Sara Julich | On Hold |
1/28/2025 | 417601 | COM BDG | Updated fire alarm plats attn Duncan Wood | Duncan Wood | Assigned |
4/4/2025 | 434392 | 1125 COM BDG | We're looking to get an estimate for 2 outlets connected to a dedicated circuit for a 220v outlet on a 20amp circuit and 110v outlet on a 20amp circuit. Additional location information: In room 1125 there is a wood storage rack to the left of the red flammables cabinet. Behind the wood storage rack is where we're looking to have the outlets located. Work tags to attach: PG101713, DD06945 | Dayon Royster | Assigned |
4/25/2025 | 436043 | COM BDG | Hire HM Cragg to perform 2 Hour Load Bank Tests on Emergency Generators. | Anthony Gervais | Open |
4/30/2025 | 437115 | COM BDG | We are requesting a large roll off dumpster at the Communications building(20 yard unit). This is for end of year clean up which will be mostly concrete waste and metal scrap. They would like the dumpster delivered as soon as possible. Please place unit parallel to the North wall of comms to the west (by the fence). | Jeremy Thurlby | Assigned |
5/5/2025 | 441279 | GENERAL COM BDG | Elevator gate stuck on floor 2 | Jason Burns | Open |