Work Order Lookup

Date WO # Location Description Requester Status
7/1/2021 1229 0009C FIN SVC FIRE TR: FIRE SAFETY SECURITY MODIFICATIONS COST RANGE WILL BE PROVIDED ALL ITEMS ARE DISCUSSED IN ATTACHED WORD DOC. HEATHER PARIS IS WORKING WITH LEIGH WIAND ON THE OFFICE AREA PORTION - IF LEIGH IS WILLING/ABLE TO WORK ON THE WHOLE BUILDING. WOULD LIKE TO DO A WALK THROUGH WHEN TIME ALLOWS TO DISCUSS ITEMS/AREAS. LOCATION: GARAGE AREA DESIRED COMPLETION DATE: DESIRED PROJECT COST: FUNDING CONTACT: ANDERSON, ELLEN RENAE Emily Goodall Open
11/14/2024 404237 0009 FIN SVC replace two emergency lights in room, east wall. Will need to contact DPS for access. Janet Schneider Assigned
6/16/2025 448887 0012 FIN SVC I changed the vacuum bag the lid won't shut or run Barbara Heldt Materials-Awaiting
7/24/2025 460530 FIN SVC Some staff members in the office areas at FSB Rooms 0001-0007 have early AM work start times and the building is often very warm first thing in the AM. We would request that the AC/cooling start cooling the building at 5am so it's not so warm when staff arrive. Thank you! Kimberly Whitham Assigned
9/29/2025 475391 0009B FIN SVC Clean debris off coils in duct-work Attention: Clint Rothfus Clint Rothfus Assigned
10/9/2025 479445 0017 FIN SVC We have a leak that is puddling in the men’s restroom. Dripping water in the area of the fire detector/alarm Kimberly Whitham Assigned
10/10/2025 479480 0009B FIN SVC Pipes going out the top and the copper pipe out the side of the air separator both have a slow leak. Clint Rothfus Assigned
10/10/2025 479542 0012 FIN SVC Boiler not running attn chris grosz Christopher Grosz Assigned