Work Order Lookup
Date | WO # | Location | Description | Requester | Status |
---|---|---|---|---|---|
7/1/2021 | 1229 | 0009C FIN SVC | FIRE TR: FIRE SAFETY SECURITY MODIFICATIONS COST RANGE WILL BE PROVIDED ALL ITEMS ARE DISCUSSED IN ATTACHED WORD DOC. HEATHER PARIS IS WORKING WITH LEIGH WIAND ON THE OFFICE AREA PORTION - IF LEIGH IS WILLING/ABLE TO WORK ON THE WHOLE BUILDING. WOULD LIKE TO DO A WALK THROUGH WHEN TIME ALLOWS TO DISCUSS ITEMS/AREAS. LOCATION: GARAGE AREA DESIRED COMPLETION DATE: DESIRED PROJECT COST: FUNDING CONTACT: ANDERSON, ELLEN RENAE | Emily Goodall | Open |
11/14/2024 | 404237 | 0009 FIN SVC | replace two emergency lights in room, east wall. Will need to contact DPS for access. | Janet Schneider | Assigned |
6/16/2025 | 448887 | 0012 FIN SVC | I changed the vacuum bag the lid won't shut or run | Barbara Heldt | Materials-Awaiting |
7/24/2025 | 460530 | FIN SVC | Some staff members in the office areas at FSB Rooms 0001-0007 have early AM work start times and the building is often very warm first thing in the AM. We would request that the AC/cooling start cooling the building at 5am so it's not so warm when staff arrive. Thank you! | Kimberly Whitham | Assigned |
9/29/2025 | 475391 | 0009B FIN SVC | Clean debris off coils in duct-work Attention: Clint Rothfus | Clint Rothfus | Assigned |
10/9/2025 | 479445 | 0017 FIN SVC | We have a leak that is puddling in the men’s restroom. Dripping water in the area of the fire detector/alarm | Kimberly Whitham | Assigned |
10/10/2025 | 479480 | 0009B FIN SVC | Pipes going out the top and the copper pipe out the side of the air separator both have a slow leak. | Clint Rothfus | Assigned |
10/10/2025 | 479542 | 0012 FIN SVC | Boiler not running attn chris grosz | Christopher Grosz | Assigned |