Work Order Lookup

Date WO # Location Description Requester Status
11/27/2023 324997 HUB Back of house offices and prep area/storage area is very cold (SouthEast) Molly Heidenreich Assigned
7/23/2024 377009 HUB Tree fell on the hub Jada Olson Assigned
8/2/2024 381280 A HUB Roof Replacement Replace existing 3 tab roof with Class 4 architectural shingles. Work to be completed prior to fall classes beginning. Nathan Graves Closed
4/28/2025
4/1/2025 430759 HUB North side of the Hub Between the hub and park library is a walk light BW36(B) is not working. This is a shoe box style fixture that will need a new style replacement fixture. John Rice Materials-Awaiting
4/3/2025 434198 1050 HUB the steam water pipe is leaking going into air handler 3 I put a tray under it, will need looked at sooner than later John Moore Closed
4/14/2025
4/3/2025 434231 1050 HUB Insulate steam lines on AHU2 & AHU3. See Mike Moore for further details. Lyle Bishop Assigned