Work Order Lookup
Date | WO # | Location | Description | Requester | Status |
---|---|---|---|---|---|
7/29/2022 | 210587 | A L A | branches need cut back off the roof on the northwest side of the building. | Daniel Dankel | Assigned |
2/20/2023 | 260091 | 0102 L A | Large crack in window on right side of office. | Beth Paulsen | Materials-Awaiting |
10/31/2024 | 399072 | C0220 L A | Fire Marshall Violation - Electrical Exit light (EXL 8) and Exit light (EXL 7) both on third floor near stairwell are poorly lit, and it is recommended they be replaced | Michael Kaldenberg | Assigned |
12/20/2024 | 411371 | 0005 L A | The temperature in room 5 (puppet lab) seems a bit cold. | Beth Paulsen | Assigned |
4/8/2025 | 434659 | 0101 L A | There is no heat in RM 101 - Temps in the 50's | Sarah Lefeber |
Closed 4/15/2025
|
4/23/2025 | 435873 | L A | We would like all the windows cleaned on the 2nd and 3rd floor of the Landscape Architecture Building, on the inside and outside of the windows. Our worktag number is PG102953 | Sarah Lefeber | Open |