| Date | WO # | Location | Description | Requester | Status |
|---|---|---|---|---|---|
| 6/3/2022 | 196368 | LEBARON | Utility Engineering Lebaron Hall Replacement | Michael Olson | Open |
| 11/30/2023 | 325388 | LEBARON | CP002668-Utility Engineering-LeBaron Hall replacement-Purchase utility transformer | Michael Olson | Open |
| 3/19/2024 | 349275 | LEBARON | CP002668-Utility Engineering-Purchase switchgear for LeBaron Hall Replacement project | Michael Olson | Open |
| 6/7/2024 | 368960 | GENERAL LEBARON | The LeBaron/MacKay loading dock has no lights and is pitch black. Thanks. | David Lunaburg | Assigned |
| 6/25/2024 | 371654 | LEBARON | Lebaron Replacement - Utility Metering | Caleb Barduson | Open |
| 1/8/2025 | 415082 | LEBARON | Please determine size needed for a replacement bladder tank in the existing hot water heating system that is now only serving the foyer and Auditorium. | Michael Hanson | Assigned |
| 2/11/2025 | 421797 | GENERAL LEBARON | Replace VFD 1 on air handler supply fan | Jeremy Forristall | Assigned |
| 7/21/2025 | 459956 | C1005 LEBARON | Ceiling in LeBaron-HNSB lobby #1105 leaked possibly due to heavy rains over weekend. Possible roof drain clog. See attached photo. | David Lunaburg | Assigned |
| 7/30/2025 | 461436 | 1210 LEBARON | missing chair, row L, seat 22, there is a seat in the mechanical room near the auditorium, not sure if it can replace the missing one or not | Janet Schneider | Assigned |
| 8/5/2025 | 464748 | LEBARON | Lebaron Hall Replacement - Utility Veris Meters | Caleb Barduson | Open |
| 10/20/2025 | 480135 | 1030 LEBARON | Repair Fire Panel Inspection deficiencies: "Mackay basement strobes are not working. Smoke detector by 1st floor corridor by stair 0140, reception area 0133 and ground floor hallway 0030 east is missing cap 4098-9714." ATTN: Kevin Vols | Sailesh Gautam | Assigned |
| 10/29/2025 | 481285 | 1210 LEBARON | Light panel is falling open above the southwest projector in LeBaron auditorium will need large ladder estimate about 20ftish | Joshua Huffman |
Closed 11/17/2025
|
| 11/3/2025 | 485363 | 1210 LEBARON | Water pouring out of the ceiling outside the Men's room . Part of the ceiling has come down. | Amanda Kramer | Assigned |
| 11/3/2025 | 485365 | 1210 LEBARON | Water leak. Ceiling collapsed. Need assistance with sucking up water. | Benjamin Adams |
Closed 12/2/2025
|
| 11/3/2025 | 485375 | 1210 LEBARON | Cold room-no steam-repair steam leak- | Christian Pitt |
Closed 11/18/2025
|
| 11/5/2025 | 485508 | 1201 LEBARON | Vacuum stand up E051729 has a broken hose doesn't suck on carpet | Julie Wengert | Materials-Awaiting |
| 11/10/2025 | 485783 | LEBARON | Attn James Long call back try and keep the auditorium and corridor from freezing | James Long |
Closed 11/13/2025
|
| 11/10/2025 | 485872 | GENERAL LEBARON | Room 1022x-3 -- room not secure per Michael Smith | Michale Smith |
Closed 11/11/2025
|
| 11/13/2025 | 486158 | LEBARON | Steam leak in the basement of new lebaron | Michael Solberg |
Closed 11/20/2025
|
| 11/21/2025 | 486747 | LEBARON | Please remove portion of chain link fencing around textile shredder located in room 1030 LeBaron. Please coordinate with Bart Dobson for extent of fence removal. | Elizabeth Clarke |
Closed 12/2/2025
|
| 12/2/2025 | 490777 | 1201 LEBARON | ATTENTION Brock Palar.......hose broken from the base area of vacuum. see attached by photo. | Ashley Frank |
Closed 12/5/2025
|