Work Order Lookup

Date WO # Location Description Requester Status
8/19/2021 107149 N CHWP Disassemble, clean, inspect and repair AUMA electric actuator. Lee Mason Open
3/8/2022 170827 GENERAL N CHWP Insulate sand filter and sand filter lines. Lee Mason Open
4/1/2022 179796 GENERAL N CHWP Clean out drain in front of new filter in the basement. Lee Mason Open
7/24/2023 295534 N CHWP Replace existing CHW Flow meters with new Flexim devices at Ben's desk. C6 - REMOVAL OF INSULATION FOR METER INSTALLATION AND TESTING - Done per Ben 6/11/24 Gordon Woods Open
11/16/2023 323870 N CHWP MOVE H 550 TANK NEXT TO 198 TANK AND ALL ASSOCIATED PIPING. PIPE NEW TO EXISTING TAPS AND ADD A SWITCHABLE OUTLET FOR PUMP FROM EXISTING OUTLET ON 198 TANKS. Shawn McClain Open
3/22/2024 349607 N CHWP North Chilled Water Plant Evaporator Chilled Water Flow Switch PDSLL-101 Verify 2.7psi falling setpoint, set switch to reset at minimum DP and report back what this value is and the repeatability. Leave switch set for minimum DP to "activate" -Done per Ben Young Ashcroft switch has arrived that should give far better differential. Bench calibrate to .9 psi and check the switch deadband at this DP to see how repeatable it is. Install on Chiller 5 and see where this puts us for flow. (Approx 2400 gpm, just over) We want to back it down to the 2400 which I anticipate will be around .88 psi. We can then set timer to 15 seconds and also sync up the transmitter trip settings to match in the PLC so both devices trip at the same threshold. Ben Young Open
3/28/2024 350886 N CHWP C5 - ADD FREON TO PROPER LEVEL Brian Thilges Open
6/14/2024 369445 N CHWP - NCWP - CHILLER#6 COOLING TOWER MAKE UP VALVE NOT WORKING. Michael Mayfield Open
8/9/2024 382489 N CHWP BLDG BUILDING SYSTEMS - PURCHASE OF SYSTEM/VALVE TAGS FOR UPDATING THE IDENTIFCATION OF THE SYSTEM VALVE WITH THE PLANT ONE-LINES Gordon Woods Closed
4/22/2025
11/5/2024 403445 0100 N CHWP The electrical box over the Sewage Ejection pump is broken and has electrical stuff hanging from it. Brian Thilges Assigned
11/13/2024 404146 N CHWP NCWP - NO UNIT HEATERS ARE WORKING EXCEPT UH 1. INSPECT UNIT HEATERS AND TRAPS FOR PROPER OPERATION. AND WHERE THE HEATERS ARE POWERED FROM. CONTACT GORDON WOODS FOR LABELING OF VALVES TRAPS AND UNIT HEATERS. Brian Thilges Assigned
12/17/2024 410975 N CHWP BLDG-BUILDING SYSTEMS - REPAIR NECESSARY FROM THE SEMI-ANNUAL ROOF INSPECTION Gordon Woods Open
1/6/2025 414921 N CHWP NCWP - REPLACE MEDIA IN SAND FILTER Brian Thilges Open
2/17/2025 422218 N CHWP C6-VFD-01 - PERFORM 5-YEAR MAINTENANCE ON CHILLED WATER PUMP VARIABLE FREQUENCY DRIVE. Matthew Shriver Open
2/17/2025 422219 N CHWP C6-VFD-02 - PERFORM 5-YEAR MAINTENANCE ON CIRCULATING WATER PUMP VARIABLE FREQUENCY DRIVE. Matthew Shriver Open
4/29/2025 436970 GENERAL N CHWP NCWP - LINK SEAL ON CONDENSER WATER RETURN PIPE LEAKS. Brian Thilges Open