7/20/2022 208674 GENERAL SEED Trees need to be pruned off East and Southeast sections of roof. Daniel Dankel Assigned
1/30/2023 254744 M0260B SEED Chilled water valve on Heat Exchanger leaking. Please fix. Thanks, Bob Bob Betts Assigned
4/3/2023 272161 0174BB SEED Seed, Room 174BB, Zone temp Unreliable , Critical point Donald Boyle Assigned
4/5/2023 272410 0174D SEED Room is too hot Derrick Mayfield Open
4/14/2023 273277 0185 SEED Rooms 185 and 187 are very hot, heat continues to come out. Derrick Mayfield Open
10/25/2023 317431 0115 SEED Seed Science has two rooms that were designed as "dividing rooms". For some reason room 113 was designed to have much better air movement up through the ductwork than room 115 has. Darren Huntley did everything he could think of to increase the air movement in room 115. He said something about the ductwork being different. I don't know if this should have been a project or just further repairs, but in any case the end goal is more air movement to protect worker health and to allow a computer to be put in this room. Mike Stahr Assigned
3/1/2024 344789 SEED We need someone to use a forklift to move 18 pallets of sand, stacked in pairs of two, from the ground to the East dock in the germination lab, and one to the West dock. The sand will be delivered in the morning either on Tuesday 3-6 or Wednesday 3-7. We will know by the end of Monday which one is correct and can communicate it then. We also need the forklift to help us move a 1 ton tub of soil from one dock to another, which could be done at the same time. I'll submit a separate request for this. Will Zastrow Assigned
3/1/2024 344794 SEED We need someone with a forklift to move an empty bin of soil from the East dock at the Seed Science Center to the West dock, and then we need to move a full bin of soil back from the West dock to the East dock. Could probably be done at the same time that request ID 344789 is done next week. Will Zastrow Assigned
5/13/2024 362818 SEED tunnel access at seed lab dock. David Chenevert Assigned
5/29/2024 364954 GENERAL SEED INTRAMURAL TO PRINTNG Joseph Stoberl Open
6/23/2024 370241 SEED FY25 Move Soil Bins And Remove Sand At Seed Science (StandRenew) FPM Service Desk Open
8/6/2024 381616 0121 SEED 2 Ceiling fans not working in R121. Kim North Open
8/9/2024 382555 0121 SEED Attn Jlamb: the cold room has 36 old T-12 fixtures with multiple light bulbs out re-lamp with T-12/T-8 replacement bulbs and label the fixtures to identify the ballast are T-12 Jeffrey Lamb Assigned
1/23/2025 416606 0127 SEED We have an area in the that is set up as a desk area at this time. The lab manager is moving to an office and they will no longer need that desk area. They would like to see about adding shelves for storage, or possible sit/stand work area. We need assistance to figure out what could be done to make this more useable space. Teresa Howard Open
2/26/2025 423208 0178 SEED Several ceiling lights burnt out in lab spaces 0178,0174,0174b. Thank you Rhett Clayton Assigned
3/7/2025 427984 0121 SEED CP1264020-Utility Engineering-Seed Science generator Michael Olson Open
3/12/2025 428458 0148 SEED I tried replacing the T8 fluorescent lamps in the NE light fixture but one of the the ballasts apparently needs to be replaced. The existing ballast is a Triad B232IUNVHP-B that slides into tabs on the sheet metal frame. The fixture has new bulbs but I also have a few spare T8 bulbs here if needed for testing. Additional location information: NE fluorescent light fixture Alan Gaul Open
3/13/2025 428479 0128F SEED Several LEDS not working properly. Kim North Open
3/24/2025 429477 0185 SEED In rooms 185 and 187 there are lights out. Derrick Mayfield Assigned
3/26/2025 429723 GENERAL SEED Central States to provide estimate to move rock and add new rubber membrane sheet. John Breon Assigned
4/8/2025 434550 0127 SEED Need to replace a few bulbs that are burnt out. Kaitlin Metzger Assigned
5/19/2025 435199 0128 SEED Sink drain in RM 141 is not draining properly. Kim North Assigned
4/24/2025 435963 SEED We need an assessment and design plan for our current break room (Rm 158). Items from our Purity lab (Rm 105), like coffee machine and refrigerator need to be moved to the break room space and we need some assistance deciding the most efficient way to reorganize the break room to accommodate these items. The break room will possibly need a few more cabinets with countertop that can be locked and a better way to organize our microwaves. We may need different appliances also. The scope of this project would include both rooms 105 and 158 as we may need to make changes in both areas. Tess Howard Open
5/15/2025 442226 0102A SEED Patch and Paint for all walls. (North wall is a block wall, currently white) White for East and South walls SW7588 Showstopper for West and North walls mv Lloyd Assigned
5/20/2025 442570 GENERAL SEED Light burnt out in hallway by west restrooms. Light burnt out in hallway outside of custodial closet. Thank you Rhett Clayton Assigned
5/20/2025 442581 0141 SEED Water on the floor coming from the ceiling. A trash can was placed under the leak. Kim North Assigned