| Date | WO # | Location | Description | Requester | Status |
|---|---|---|---|---|---|
| 8/23/2021 | 107804 | STADIUM | Can you put together a service request to perform a structural deferred maintenance evaluation Jack Trice Stadium? Attn Jon Harvey | Andrew Kautman | Assigned |
| 5/2/2023 | 279247 | STADIUM | Over-seeding bare areas around Jack Trice Stadium | Joel Bender | Open |
| 10/27/2023 | 318296 | STADIUM | Heat tape | Miles Pankonen | Assigned |
| 1/12/2024 | 335804 | STADIUM | Square D to replace existing switchboard main breaker in west concourse electrical room at Jack Trice Stadium. | Michael Olson | Open |
| 1/3/2025 | 414790 | STADIUM | Util Eng - 2025 Verizon Small Cell Site Support | Travis Van Dyke | Open |
| 3/4/2025 | 427259 | STADIUM | Update fire alarm plat for new devices for press tower. Attn Duncan Wood | Duncan Wood | Assigned |
| 3/21/2025 | 429382 | STADIUM | Util Eng - New TV Truck Pad Walk-in Cabinet at Jack Trice - Concrete and Electrical Support | Travis Van Dyke |
Closed 11/14/2025
|
| 4/4/2025 | 434410 | STADIUM | Helping with a volume calculation of the chilled water system for the Stadium’s press tower. They had a leak in this system that was discovered yesterday/last night. He was asked to provide this information to EHS. | Miles Pankonen | Assigned |
| 4/7/2025 | 434532 | STADIUM | Jack Trice chiller glycol spill and cleanup activities | Michael Olson | Open |
| 5/28/2025 | 443818 | STADIUM | Need help from Joe Flaherty with a Metasys controlled lighting controller in NE concession POD on Jack Trice Stadium. | Ken Ely | Assigned |
| 6/2/2025 | 447208 | STADIUM | Barron Equipment inspection. | Anthony Gervais | Open |
| 6/23/2025 | 450823 | STADIUM | Please submit a project request to FPM to review options for adding fencing and gates around the Reiman Plaza area and near south entrance to Jack Trice Stadium. | Andrew Kautman | Open |
| 8/6/2025 | 464929 | STADIUM | Attn: Jon Harvey Please submit a project request to FPM to update the lights in Jack Trice Stadium. Projected budget of $1.75MM | Andrew Kautman | Open |
| 8/12/2025 | 465604 | M1065 STADIUM | Repair Fire Alarm Panel system deficiencies: West Side All Areas: Only horn strobe connected directly to panel worked during full test. Activating multiple pull stations did not trigger alarms. ATTN: Duncan Wood | Sailesh Gautam | Assigned |
| 9/8/2025 | 472035 | STADIUM | Fire alarm support for football game | Miles Pankonen | Open |
| 9/16/2025 | 473769 | STADIUM | Compassi Power washer is not releasing chemical or water.. Please call Laura with questions | Laura Fernandez-Stowe | Assigned |
| 10/1/2025 | 475632 | STADIUM | Talked to Joe Flaherty about programming for 2 new domestic hot water sensors at Sukup South End Zone. | Ken Ely | Assigned |
| 11/24/2025 | 486875 | STADIUM | Julie/DPS reported alarms showing panel trouble at the Stadium west side, east side, Jacobsen and the sports performance | Barbara Schumacher |
Closed 12/1/2025
|