8/15/2022 | 215959 | VET POW | VM - FEEDWATER CONTROL HARDWARE IS STARTING TO FAIL. CONVERT CONTROL HARDWARE TO ALLEN-BRADLEY. | Matthew Shriver | Open |
10/6/2022 | 230556 | VET POW | VM - MOVE ELECTRICAL LOADS TO INCREASE RELIABILITY | Matthew Shriver | Open |
7/19/2023 | 294678 | VET POW | VM-B2 - DURING THE ANNUAL INSPECTION FOUND THE BACK PLATE TO BE WARPED AND HAVING THERMAL DAMAGE. WILL ORDER PARTS AND REPLACE. | Gordon Woods | Open |
3/11/2024 | 348722 | VET POW | Backflow preventer leaking - E046849 | Brian Thilges | Assigned |
4/25/2024 | 356812 | VET POW | VM - C2A-C2B REPLACE VALVES VM FCV 2A1 AND VM FCV 2B1. THESE WILL BE REPLACED DURING WINTER SHUTDOWN BY UPMM. | Brian Thilges |
Closed 4/7/2025
|
6/18/2024 | 369796 | 0102 VET POW | VM - New UPS system install to feed PLC cabinets and loads served by SolaHD UPS devices. Install Schneider/APC 24U Server Cabinet Containing: 10kVA UPS – 6U 208 to 120 Transformer (x2) – 2U per, 4U total Service Bypass Switch – 4U Standby Battery (x2) – 3U, 6U total Spare Slots – 4U Install 45kVA Transformer, 480 to 120/208, Fed by PNL-HE, Feeding PNL-LE Remove/Demo old 15kVA Transformer and Piping Install UPS distribution panel for essential loads, 16x16x6 w/ DIN Rail Breakers Transfer loads from PNL-LE to PNL-XXX (UPS) | Ben Young | Open |
10/24/2024 | 397735 | VET POW | VM - B2 - REPLACE CIRCULATING PUMP ON BOILER. BEARINGS SOUND ROUGH. REBUILT PUMP IS AT VET MED. | Brian Thilges |
Closed 4/24/2025
|
10/24/2024 | 397772 | VET POW | VM - DA - Please run a single ethernet cable from the Condensate Transfer Pump control panel to the PLC panel on the DA skid. Run 4 ethernet cables from each boiler feed pump VFD to the PLC cabinet. Power Supplies and Ntron units on order for installing in PLC & Condensate Transfer Pump control panels. | Benjamin Young | Open |
12/5/2024 | 410165 | VET POW | VM - TEMPERED WATER FOR SAFTEY EYEWASH STATION IN CHEMICAL ROOM HAS LEAKS AND MAY NEED REPLACED. | Brian Thilges | Open |
12/20/2024 | 411336 | VET POW | VM - C1A - FIX LEAK ON OIL RETURN LINE | Brian Thilges |
Closed 4/21/2025
|
2/24/2025 | 423017 | VET POW | VM - C2A - TROUBLESHOOT OIL PUMP STARTER BOARD. YORK WILL DO THIS. | Brian Thilges |
Closed 5/1/2025
|
3/7/2025 | 427960 | VET POW | Refueling generator since the fuel truck will be on site and this unit has a small fuel capacity. Attn: Eric Robinson | Eric Robinson | Assigned |
3/18/2025 | 428815 | VET POW | VM - LEAK ON WATER LINE FEEDING OFFICE AREA | Brian Thilges | Open |
4/21/2025 | 435597 | VET POW | Generator needs a cover made to prevent animals from entering the gen set Attn: Eric Robinson | Eric Robinson |
Closed 4/25/2025
|
4/22/2025 | 435743 | 0105 VET POW | 2" Backflow failed testing, needs repair. | Lyle Bishop | Open |
4/25/2025 | 436066 | VET POW | Hire HM Cragg to perform 2 Hour Load Bank Tests on Emergency Generators. | Anthony Gervais | Open |
4/29/2025 | 436972 | VET POW | VET POW - C1A - REPLACE B&G BOOSTER PUMP THAT COOLS VFD. | Brian Thilges | Open |