Current Projects in Applied Science Complex 1
ASC 1-0012-416733-Automatic Fire Dampers
Project Closeout
Room: 0012
Request date: 2/18/2025
Requested by: Alex Wiley
Contact: Mitchell Hlavacek
Construction start:
Construction end:
Description:
The double doors for the boiler room contain fixed vents despite the 2012 boiler upgrade plans requiring a 2HR rating for the room. 90 min doors that meet the requirements for IBC chapter 7 requirements for opening protectives should be installed. Any remaining ventilation should contain proper automatic fire dampers. This may need to be upgraded to a project.
ASC 1-D-444028-Replace HEF 24
Construction Documents
Room: D
Request date: 5/30/2025
Requested by: Michael McCoy
Contact: Mike McCoy
Construction start: 8/11/2025
Construction end: 2/9/2026
Description:
Replacement of HEF 24 at ASC 1.
ASC 1-GENERAL-449283-Nitrogen Piping Retrofit
Schematic Design
Room: General
Request date: 6/19/2025
Requested by: Qingfeng Xing
Contact: Brendan Harms
Construction start: 9/28/2025
Construction end: 3/29/2026
Description:
Need a quote for the fix at first as we are at the transition period from the old to the new fiscal year. Fix the leakage at a joint in the liquid nitrogen line. If possible, change the plumbing so that the future repair do not need to cut the pipe off. Note (1) this is for liquid nitrogen flow at a temperature at least -196°C (-321°F), and (2) the nitrogen is for research needing high purity nitrogen gas or liquid nitrogen and the joint shall not release any debris and contamination. Two videos are shared. One shows the leakage. The other shows the pipe line with the joint appearing on the left of the video in the beginning. They are mov files recorded with an iPhone.
https://drive.google.com/file/d/1PjTGv43fwh1PRuCtHkhiAl-Bpc6gsncq/view?usp=sharing
https://drive.google.com/file/d/1G9TqjD4-K0Uhky5YAk_mJvr1J2Q-JwgK/view?usp=sharing