Current Projects in Jeff & Deb Hansen Ag Stdnt Lrn Ctr

ASLC-GENERAL-355335-Remodel
Schematic Design
Room: General
Request date: 4/9/2024
Requested by: Cory Walker
Contact: Carrie Choudhury
Construction start: 7/18/2024
Construction end: 1/16/2025
Description:
Update main office and conference spaces with new carpet, seating and possibly tables.
ASLC-GENERAL-356093-Floating Walls Replacement
Construction Documents
Room: General
Request date: 4/17/2024
Requested by: Lisa Peterson
Contact: Carrie Choudhury
Construction start: 6/26/2024
Construction end: 12/25/2024
Description:
I have "floating walls" in each classroom space (Rooms 1102/1104 and 1126/1128). They are both in bad shape and almost inoperable as the bottom pieces are bent and not feeding into each other properly. This is a time sensitive project as I would like to get these replaced ASAP as we utilize them often and they are quite difficult to manage at this point. Thanks!