BESSEY-0040-448601- Cooler repairs
Schematic Design
Room: 0040
Request date: 6/12/2025
Requested by: Elena Sandry
Contact: John Byerly
Construction start: 9/13/2025
Construction end: 3/14/2026
Description:
Cooler repairs See Nate for details
BESSEY-General-336643-Water Heater Study
Cost Range Approval
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Amanda Kramer
Construction start: 5/6/2026
Construction end: 11/4/2026
Description:
We would like to have the Engineering Team review the recently installed Water Heater for code compliance in the mechanical room and develop a detailed plan to correct any deficiencies found that could be shared with either a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
BESSEY-General-443843-Plant Benches
Budget Approval
Room: General
Request date: 5/29/2025
Requested by: Kenneth McCabe
Contact: Alexa Peters
Construction start: 7/10/2025
Construction end: 1/8/2026
Description:
Estimate for putting togetherr 45 metal plant benches of various sizes in the Bessey Greenhouse