Current Projects in Black Engineering Bldg

Black Engineering - Rm 1091 - 362236 - Fume Hood
Bidding
Room: 1091
Request date: 5/13/2024
Requested by:
Contact: Mitchell Hlavacek
Construction start: 3/24/2025
Construction end: 9/22/2025
Description:
We are considering moving Todd Kingston into 1091 Black but he needs a fume hood. How much would it be to put a fume hood in 1091 Black?
BLACK-1076-416506-Install aluminum glass doors
Budget Approval
Room: 1076
Request date: 1/23/2025
Requested by:
Contact: Denise Wulf
Construction start: 4/7/2025
Construction end: 10/6/2025
Description:
Install aluminum glass doors like the ones we have been installing previously in 1076 Black. This room has an aluminum glass door already but we would like the double doors to the hallway to be aluminum and glass as well. Thank you!
BLACK-1095-362831-Demo Old Hoods, Add Fume Hood
Construction Documents
Room: 1095
Request date: 5/17/2024
Requested by:
Contact: Mike McCoy
Construction start: 4/17/2025
Construction end: 10/16/2025
Description:
purchase and install fume hood in 1095. Remove all existing exhaust hoods and replace with one fume hood. Adjust HVAC so the lab remains BSL2
BLACK-1118-427702-Rooms 1118 & 1091-Replace Interior Door
Construction Documents
Room: 1118
Request date: 3/7/2025
Requested by:
Contact: Steven Daniels
Construction start: 5/20/2025
Construction end: 11/18/2025
Description:
The interior door is missing between rooms 1118 Black and 1091 Black. We have looked all over for it thinking it may have been stashed away in a closet or maintenance space but can not find this door anywhere. We would like a solid windowless metal door installed.
BLACK-C1039-411111-Repair Terrazzo Flooring
Construction
Room: C1039
Request date: 12/18/2024
Requested by:
Contact: Mitchell Hlavacek
Construction start: 2/7/2025
Construction end: 8/8/2025
Description:
The terrazzo flooring is damaged along the expansion joint in this hallway. Please repair the terrazzo floor. Black engineering filled the expansion joint with epoxy and this will need to be removed prior to repairs.
BLACK-General-336419-Safety Showers
Project Closeout
Room: General
Request date: 1/19/2024
Requested by:
Contact: Eric Ohrt
Construction start: 5/29/2024
Construction end: 1/27/2025
Description:
EHS has indicated multiple research labs on the first floor of Black require safety showers. 1116, 1095 and 1103
BLACK-GENERAL-337207-Third Floor Carpet Replacement
Budget Approval
Room: General
Request date: 1/25/2024
Requested by:
Contact: Denise Wulf
Construction start: 4/7/2025
Construction end: 10/6/2025
Description:
New carpet in all the offices and conference rooms on the third floor like what we have been installing on the second floor. When all the IMSE folks move out when their new building is done replace all the carpet on the third floor with the new carpet we are having installed on second.
BLACK-General-356004-Repair-Replace Glass Block
Cost Range Approval
Room: General
Request date: 8/15/2024
Requested by:
Contact: Denise Wulf
Construction start: 6/1/2025
Construction end: 11/30/2025
Description:
Outside of RM C3001 in the stairwell, there is water comin down the wall, possibly from the window. The glass block is leaking and will need to be repaired/replaced.
BLACK-General-357837-New Carpet Rms 1012 & 0095
Construction
Room: General
Request date: 4/29/2024
Requested by:
Contact: Eric Ohrt
Construction start: 9/24/2024
Construction end: 3/25/2025
Description:
New carpet squares installed over raised floors in computer lab 1012 and a classroom 95E in Black. We prefer square tiles that can be carpet taped at the corners so we can still access the wiring underneath. Like the carpet in 1020 Black. There is a lot of foot traffic and rolling chairs so something that wears well.
BLACK-General-362574-Improve Exhaust Capacity
Construction Documents
Room: General
Request date: 5/13/2024
Requested by:
Contact: Mike McCoy
Construction start: 4/17/2025
Construction end: 10/16/2025
Description:
Building wide HVAC study. We have been talking about this with Mike McCoy and Scott Jasper for some time and now we are ready to proceed in concurrence with the building plan for possible donor funded projects conducted by Sarah Lawrence and her team. It will be important to consider immediate needs while also thinking about possible future changes to the building.
BLACK-GENERAL-423184-Lab(s) Remodels
Schematic Design
Room: 1098
Request date: 2/27/2025
Requested by:
Contact: Steven Daniels
Construction start: 6/11/2025
Construction end: 12/10/2025
Description:
My department chair has asked me to get an estimate for replacing the sinks and cabinets in three labs (1098, 1092, 1076) with new fixtures and putting a new sink and eye wash station in one lab (1070). I also need an estimate for removing the tile flooring in 1076 and 1070 and resealing the concrete floors. Thanks
BLACK-GENERAL-428907-Purchase Chairs
Project Initiation
Room: General
Request date: 3/19/2025
Requested by:
Contact: Mitchell Hlavacek
Construction start: 6/27/2025
Construction end: 12/26/2025
Description:
Research and purchase comfy chairs for hallway nook areas. Working with Carrie Choudhury
BLACK-Rms 2019A, 2019, 2019B, 2025, 2029-382537-New Carpet
Construction
Room: General
Request date: 8/12/2024
Requested by:
Contact: Eric Ohrt
Construction start: 11/8/2024
Construction end: 5/9/2025
Description:
New carpet like the carpet we just ordered for all the offices on 2nd floor Black installed in 2019A, 2019, 2019B, 2025 and 2029
BLACK-Room 2103-Fume Hood
Construction
Room: 2103
Request date: 7/16/2021
Requested by:
Contact:
Construction start: 2/19/2025
Construction end: 8/20/2025
Description:
Install new fume hood with acid and flammables base cabinet