Current Projects in Black Engineering Bldg
Black Engineering - Rm 1091 - 362236 - Fume Hood
Construction Documents
Room: 1091
Request date: 5/13/2024
Requested by: Sandy Sayer
Contact: Mike McCoy
Construction start: 10/8/2024
Construction end: 4/8/2025
Description:
We are considering moving Todd Kingston into 1091 Black but he needs a fume hood. How much would it be to put a fume hood in 1091 Black?
BLACK-1072-375832-Remove Floor Tile
Construction
Room: 1072
Request date: 7/10/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 8/1/2024
Construction end: 1/30/2025
Description:
remove floor tile, polish and seal concrete floor. We need to push all computers and desks to half the room and remove the tiles then push the computers and tables to the other half and finish removing tiles.
BLACK-1091-371675-Remove Floor Tiles
Project Closeout
Room: 1091
Request date: 6/26/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 7/10/2024
Construction end: 7/25/2024
Description:
Please remove the floor tiles from the other half of 1091 Black. Buff and seal the concrete floor. All equipment has been removed.
BLACK-1095-362831-Demo Old Hoods, Add Fume Hood
Construction Documents
Room: 1095
Request date: 5/17/2024
Requested by: Sandy Sayer
Contact: Mike McCoy
Construction start: 10/8/2024
Construction end: 4/8/2025
Description:
purchase and install fume hood in 1095. Remove all existing exhaust hoods and replace with one fume hood. Adjust HVAC so the lab remains BSL2
BLACK-2016-369838-Furniture
Construction
Room: 2016
Request date: 6/20/2024
Requested by: Ethan Secor
Contact: Eric Ohrt
Construction start: 8/28/2024
Construction end: 2/26/2025
Description:
I am interested in potentially getting new furniture for my office, Black Engineering 2016. One of my colleagues (Todd Kingston, Black Engineering 2036) recently worked with FP&M to get new furniture in his office, and I may be interested in simply duplicating the furniture selection that he made, depending on price and similar options.
BLACK-2022-322850-Office Furniture and Design
Construction
Room: 2022
Request date: 11/3/2023
Requested by: Sougata Roy
Contact: Eric Ohrt
Construction start: 2/2/2024
Construction end: 9/13/2024
Description:
I would like to setup my office space with proper furniture and designs. It will be helpful if someone stop by my office to discuss and share their ideas for that. Thanks!
BLACK-2095-382536-Flooring
Construction
Room: 2095
Request date: 8/12/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 9/4/2024
Construction end: 3/5/2025
Description:
Please remove the floor tiles in this lab and polish and seal the concrete floor. I will have it emptied mid September.
BLACK-C0089-371403-Repair Leaks
Cost Range Approval
Room: C0089
Request date: 6/24/2024
Requested by: Lyle Bishop
Contact: Denise Wulf
Construction start: 11/22/2024
Construction end: 5/23/2025
Description:
Multiple leaks in Hallway C0089, needs to be repaired.
BLACK-General-336419-Safety Showers
Construction
Room: General
Request date: 1/19/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 5/29/2024
Construction end: 11/27/2024
Description:
EHS has indicated multiple research labs on the first floor of Black require safety showers. 1116, 1095 and 1103
BLACK-GENERAL-337207-Third Floor Carpet Replacement
Budget Approval
Room: General
Request date: 1/25/2024
Requested by: Sandy Sayer
Contact: Denise Wulf
Construction start: 9/28/2024
Construction end: 3/29/2025
Description:
New carpet in all the offices and conference rooms on the third floor like what we have been installing on the second floor. When all the IMSE folks move out when their new building is done replace all the carpet on the third floor with the new carpet we are having installed on second.
BLACK-General-341774-2nd Floor Carpet Replacement
Construction
Room: General
Request date: 2/6/2024
Requested by: Sandy Sayer
Contact: Eric Ohrt
Construction start: 8/23/2024
Construction end: 2/21/2025
Description:
New carpet for the rest of the 2nd floor offices in 3 phases over summer
Phase 1: 2008, 2011, 2020, 2030, 2038, 2035, 2078, 2098
Phase 2: 2010, 2016, 2026, 2034, 2068, 2072, 2092, 2102
Phase 3: 2012, 2018, 2028, 2036, 2070, 2074, 2096
BLACK-General-356004-Repair-Replace Glass Block
Schematic Design
Room: General
Request date: 8/15/2024
Requested by: Shelley Anderson
Contact: John Byerly
Construction start: 12/2/2024
Construction end: 6/2/2025
Description:
Outside of RM C3001 in the stairwell, there is water comin down the wall, possibly from the window.
The glass block is leaking and will need to be repaired/replaced.
BLACK-General-357837-New Carpet Rms 1012 & 0095
Construction Documents
Room: General
Request date: 4/29/2024
Requested by: Sandy Sayer
Contact: Carrie Choudhury
Construction start: 10/8/2024
Construction end: 4/8/2025
Description:
New carpet squares installed over raised floors in computer lab 1012 and a classroom 95E in Black. We prefer square tiles that can be carpet taped at the corners so we can still access the wiring underneath. Like the carpet in 1020 Black. There is a lot of foot traffic and rolling chairs so something that wears well.
BLACK-General-362574-Improve Exhaust Capacity
Construction Documents
Room: General
Request date: 5/13/2024
Requested by: Sandy Sayer
Contact: Mike McCoy
Construction start: 10/8/2024
Construction end: 4/8/2025
Description:
Building wide HVAC study. We have been talking about this with Mike McCoy and Scott Jasper for some time and now we are ready to proceed in concurrence with the building plan for possible donor funded projects conducted by Sarah Lawrence and her team. It will be important to consider immediate needs while also thinking about possible future changes to the building.
BLACK-GENERAL-382537-New Carpet
Construction Documents
Room: General
Request date: 8/12/2024
Requested by: Sandy Sayer
Contact: Carrie Choudhury
Construction start: 10/22/2024
Construction end: 4/22/2025
Description:
New carpet like the carpet we just ordered for all the offices on 2nd floor Black installed in 2019A, 2019, 2019B, 2025 and 2029
BLACK-Room 2081-Fume Hood
Project Closeout
Room: 2081
Request date: 10/14/2021
Requested by: Sandy Sayer
Contact:
Construction start:
Construction end:
Description:
Install fume hood with flammables/acid base cabinet
BLACK-Room 2103-Fume Hood
Construction Documents
Room: 2103
Request date: 7/16/2021
Requested by: Sandy Sayer
Contact: Steven Daniels
Construction start: 10/8/2024
Construction end: 4/8/2025
Description:
Install new fume hood with acid and flammables base cabinet