Current Projects in Campanile

CAMPANI-General-354890-Package Unit Replacement
Schematic Design
Room: General
Request date: 4/3/2024
Requested by: John Netwal
Contact: Brian Grove
Construction start: 7/17/2024
Construction end: 1/15/2025
Description:
The package unit in the Campanile needs to be replaced. James Long with FPM has details if needed.