Current Projects in Carver Hall

CARVER- 0210 & 0218-260003-Reconfigure Space
On Hold
Room: 0210
Request date: 2/20/2023
Requested by: Kris Kilibarda
Contact: Scott Jasper
Construction start: 5/7/2024
Construction end: 11/5/2024
Description:
Need to restructure some spaces in Carver 210 and 218 to allow for additional staff members and student gathering space.
CARVER-0001-273417-Hand Railing Installed
On Hold
Room: 0001
Request date: 4/17/2023
Requested by: Kathleen Baumgarn
Contact: Melissa Warg
Construction start:
Construction end:
Description:
We need to have a hand railing installed in this auditorium, Carver 0001. Please estimate what it would cost to have these installed for accessibility. Thank you! Katie B.
CARVER-0150E-362902-New Workstation
Construction
Room: 0150E
Request date: 5/17/2024
Requested by: Tessa Brow
Contact: Jennifer Warrick
Construction start: 7/26/2024
Construction end: 1/24/2025
Description:
We need to order furniture for another workstation in order to subdivide the 150E office into 2 office spaces while we await a more permanent solution to our space crunch. Here is what we'll need, and the details I could find about our existing furniture. 2019 Remodel Project # (when we ordered our current furniture that we want to match): PR021869/CP002559 Work Surface Laminate: Wilsonart Standard Laminate, Canyon Zephyr 4842-60, matte finish List of needed items (with photos of existing items to match attached + model number included if I could find a tag): Desk Chair (model RL-MHW.2.0.L.TCM23.UR94) Standing Desk, 54" x 29" Stationary Desk (that file cabinets can tuck under), 48" x 24" 2 Drawer File Cabinet (x2 needed) 3 Drawer File Cabinet
CARVER-0210 and 0218-279505-Remodel
Cost Range Approval
Room: 0218
Request date: 5/4/2023
Requested by: Kris Kilibarda
Contact: Scott Jasper
Construction start: 10/3/2024
Construction end: 4/3/2025
Description:
We need some new furniture in the entryway and student gathering space in our WiSE office. 4/29/2024 - Reactive project with scope change We would like to pursue the larger project that involves both Carver 210 and Carver 218.
CARVER-0232-350959-Classroom Signage
Budget Approval
Room: 0232
Request date: 3/29/2024
Requested by: Kathleen Baumgarn
Contact:
Construction start: 10/18/2024
Construction end: 4/18/2025
Description:
We have a classroom that needs new signage outside of the classroom. The sign needs to have braille with the room number and the word Classroom, also in braille. The sign would say: 0232 Classroom
CARVER-0314-348287-Add Electrical and Signage
Project Closeout
Room: 0314
Request date: 3/6/2024
Requested by: Lori Sulzberger
Contact: Jennifer Warrick
Construction start: 4/26/2024
Construction end: 6/25/2024
Description:
We need electric power added so we can install a video monitor on the wall outside 0314 Carver Hall. The current bulletin board will need to be removed, and the door sign needs to be relocated to the wall on the opposite side of the door.
CARVER-0449-335469-Remodel
Construction
Room: 0449
Request date: 1/10/2024
Requested by: Anthony Palaszewski
Contact: Jennifer Warrick
Construction start: 5/1/2024
Construction end: 10/30/2024
Description:
Carver 449 - as part of future planned remodels, we may need to remove a whiteboard from this space. We need to organize with Rusty from AVX and look into getting a quote for labor costs associated with this task. This is planned to be done with LASCASTLE funds. The quote is needed by February 1st, but no labor will need to be done until Summer 2024. 4/10/24-Added Scope Entire room patched and painted and there could be a potential ADA compliance issue also after Will met with them today.