Current Projects in College Of Design

DESIGN-0003-335127-Window Treatments
Project Closeout
Room: 0003
Request date: 1/8/2024
Requested by: Michael Miller
Contact: Leigh Wiand
Construction start: 3/13/2024
Construction end: 4/17/2024
Description:
We have some blackout shades that were removed from another room during the window project that we would like to use in room 003 (which has no shades). It appears that there are some missing components. Can heartland window coverings check this for us as far as installation and replacement of missing parts?
DESIGN-0040-241369-Install Soda Kiln
Schematic Design
Room: 0040
Request date: 12/1/2022
Requested by: Michael Miller
Contact: John Byerly
Construction start: 3/17/2025
Construction end: 9/15/2025
Description:
We would like to install a soda kiln on the patio outside of room 0040. It will also need some protection from the elements and a plan from EH&S to use the space safely. Quote for the Kiln is in G drive project folder and Lx folder.
DESIGN-0054A-349881-Lighting and Wall Covering Improvements
Schematic Design
Room: 0054A
Request date: 3/26/2024
Requested by: Michael Miller
Contact: Carrie Choudhury
Construction start: 7/15/2024
Construction end: 1/13/2025
Description:
we would like to get shades for room 054A, replace some water damaged wall covering in 054A and add track lighting similar to 054B
DESIGN-0111-341921-Remodel
Construction Documents
Room: 0111
Request date: 2/7/2024
Requested by: Robert Whitehead
Contact: Carrie Choudhury
Construction start: 6/25/2024
Construction end: 12/24/2024
Description:
College of Design Reading Room (111) and miscellaneous first floor office space (158, 158A) In fall 2023, we had engaged the services of an architecture firm, DLR, to help us understand the potential scope of this project. This project scope is limited to interior remodeling on our first floor of the College of Design. In particular the scope includes the remodeling of critical spaces for our ongoing operations and course work. The biggest project is the remodeling the former "Reading Room" space (Parks Library is shutting down operations and moving stacks out of the space) into design studios/classrooms. The first phase of this project will not involve any major demolition, extensive interior partitions, or changes in lighting, electrical, HVAC, sprinkler, or plumbing. It will simply involve new furniture, finishes, and AV installations which we can accomplish working directly with FPM. Eventually, we may have more extensive remodeling, based on what we identify as our long term use needs for this space--again, with the assistance of an architectural firm. There are other smaller miscellaneous interior remodeling projects to support our ongoing recruitment efforts (e.g., convert existing mailroom to open space space/waiting space for visitors, relocating mailroom elsewhere). Minimal changes in interior partitions and doors are necessary but not HVAC, electrical, sprinkler, etc. This will not require architectural services outside of the scope that FPM can provide. Schedule Considerations The ideal schedule for our Reading Room project m! ay not be possible--it depends, in part, on the timing of when Library will have all items moved out of our Reading room space (Room 111). Ideally if they move out by May, we can begin spending some of these funds towards the immediate reconfiguring of the space for our first phase of work. Similar timing for the mail room reconfiguration. Additional funds would be spent in Fall 2024 and Spring 2025 for architectural servi
DESIGN-0126-246203-Remodel
On Hold
Room: 0126
Request date: 12/9/2022
Requested by: Michael Miller
Contact: Melissa Warg
Construction start: 6/25/2024
Construction end: 12/24/2024
Description:
We would like to look at this space (all of the 126 spaces) holistically for renovation. We have two full time staff and 2-3 part time staff and need some dedicated meeting space as well as hoteling and closed door office space. This may include moving some plumbing as well as wall configurations.
DESIGN-0146A-272811-Seperate into Two Offices
Project Closeout
Room: 0146A
Request date: 4/10/2023
Requested by: Michael Miller
Contact: Leigh Wiand
Construction start: 10/20/2023
Construction end: 4/15/2024
Description:
We would like to make 146A into two offices. It is currently one office with a double door. Will need separate thermostats and lighting. See prior project PR024112 with details.
DESIGN-0159-316005-Dividers
Project Closeout
Room: 0159
Request date: 10/9/2023
Requested by: Michael Miller
Contact: Leigh Wiand
Construction start: 12/19/2023
Construction end: 4/17/2024
Description:
This office currently has 3 people in it. They would like to add dividers to make the space a little more organized
DESIGN-0181-280888-Lighting
Construction
Room: 0181
Request date: 5/18/2023
Requested by: Michael Miller
Contact: Jennifer Warrick
Construction start: 9/15/2023
Construction end: 4/26/2024
Description:
Duplicate design from PR024081 for the remainder of the gallery space. Update Lighting
DESIGN-0189-355360-Sprinkler System Modifications
Schematic Design
Room: 0189
Request date: 4/9/2024
Requested by: Alex Wiley
Contact: Brian Grove
Construction start: 7/15/2024
Construction end: 1/13/2025
Description:
As part of the 2024 Fire Marshal Inspection - A wall was removed above the serving counter in this room and the sprinkler does not provide sufficient coverage. The sprinkler system design needs to be addressed since the wall was removed.
DESIGN-0216-300995-Furniture
Project Closeout
Room: 0216
Request date: 8/4/2023
Requested by: Michael Miller
Contact: Leigh Wiand
Construction start: 12/19/2023
Construction end: 4/12/2024
Description:
There has been a request for new furniture in this space. Attached is what has been requested
DESIGN-0216-356477-Improvements
Project Initiation
Room: 0216
Request date: 4/23/2024
Requested by: Michael Miller
Contact: Jennifer Warrick
Construction start: 7/16/2024
Construction end: 1/14/2025
Description:
We would like to add the following items to room 216. Acoufelt wall treatment (please see attached quote). This just needs to be ordered. We do not need to have it installed Tuneable light for room 216A (please see attached quote). We will need to have this installed with electrical and a switch. 4'x6' floating glass board. Specification is Clarus Float Glass Board, magnetic. Color: CBC-506 with a box tray. No color drop option. No installation.
DESIGN-0307-210142-Remodel
Construction
Room: 0307
Request date: 7/26/2022
Requested by: Paul Bruski
Contact: Jennifer Warrick
Construction start: 4/24/2024
Construction end: 10/23/2024
Description:
This project would involve making room 307 or 326 in the College of Design into something like 4128 in SICTR (team workstations). My desire would be to have this up and running by Spring 2023. My hope would be also look at how to upgrade the finishes of the room as well (wall colors, lighting, etc).
DESIGN-0376-356474-Electrical Boxes
Schematic Design
Room: 0376
Request date: 4/23/2024
Requested by: Michael Miller
Contact: Mike McCoy
Construction start: 7/20/2024
Construction end: 1/18/2025
Description:
I would like to add inset electrical boxes to both the corridor side of the wall and the inside wall. The corridor side will be for a tablet (no ethernet required). The interior one will be for a TV hookup. This will be for 376,476,576, 392,492,592.
DESIGN-0503-323907-Design 5th floor Studio
Bidding
Room: 0503
Request date: 11/17/2023
Requested by: Michael Miller
Contact: Jennifer Warrick
Construction start: 4/26/2024
Construction end: 10/25/2024
Description:
Design 5th floor Studio; rooms 503,507,511,516 Most important in order Patched flooring (some tripping hazards) Exit signage, lights and crashbars Sprinkling (if required) Headers rebuilt Drywall patched Cabinets replaced (may be able to cut down on the number of sinks and cabinets…add tub type sinks with traps) This project began in Famis Classic under PR018876-Design 5th floor Studio
DESIGN-General-355034-Domestic Water Heater Study
Schematic Design
Room: General
Request date: 4/4/2024
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 7/15/2024
Construction end: 1/13/2025
Description:
Engineering review of the Domestic Water Heater and associated piping in Design for Code Compliance and safety. Mike McCoy, is familiar with some of the issues and I would like to have him take a closer look, develop a scope of work and cost range to bring this system into code and safety compliance to ISU standards. Please let me know if you have any questions.
DESIGN-R0125-272542-Lactation Room & Gender Neutral Bathroom
Construction
Room: R0125
Request date: 4/6/2023
Requested by: Michael Miller
Contact: Jennifer Warrick
Construction start: 10/6/2023
Construction end: 4/26/2024
Description:
We would like to investigate converting the men's restroom on the first floor into a lactation space and the women's bathroom (R0175) into a family/gender neutral bathroom.
DESIGN-Replace Air Handling Unit
Construction Documents
Room: General
Request date: 9/8/2021
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 1/25/2025
Construction end: 7/26/2025
Description:
We would like to initiate a PIR to address the following: Replace the buildings Lower Level abandoned Unit Ventilator System with a new AHU system to provide fresh and tempered air throughout the space to current code and air exchange rates. This concept was thought to be investigated previously on PR020675, but should be reviewed with the following FP&M representatives for proof of concept and design: Scott Anderson Mike Hanson Scott Jasper Brian Dangelser Andrew Mott Additional Notes: FP&M may have new fan coil units available that could possibly be repurposed to fit this application and could be confirmed by contacting Andrew Mott.
DESIGN-Rooms 181, 181-1, C0502-Lighting
Construction Complete
Room: General
Request date: 2/5/2021
Requested by: Michael Miller
Contact: Leigh Wiand
Construction start: 5/30/2021
Construction end: 2/28/2022
Description:
Rooms 181, 181-1, C0502 Lighting COST RANGE WILL BE PROVIDED I HAVE TWO LIGHTING REQUESTS. 1. WE WOULD LIKE TO REPLACE THE TRACK LIGHTING SYSTEM IN DESIGN 0181 AND 0181-1 WITH PROGRAMMABLE/REMOTE LIGHTS. THIS WILL HELP ENSURE SAFETY AND HELP SHOW STUDENTS IN LIGHTING CLASSES DIFFERENT OPTIONS. 2. WE WOULD LIKE TO HAVE SOME ADDITIONAL LIGHTS PLACED ON THE FIFTH FLOOR AT THE TOP OF THE STAIRS IN THE REVIEW SPACE (C0502). STUDENTS AND FACULTY CAN'T USE THIS SPACE AFTER IT GETS DARK. DESIRED COMPLETION DATE: KNOWN TIME CONSTRAINTS: SUMMER 2021 DESIRED PROJECT COST: FUNDING CONTACT: MILLER, MICHAEL C