Current Projects in Durham Center For Computation & Com

DURHAM- General-218602-Egress Path
Project Closeout
Room: General
Request date: 8/29/2022
Requested by: John Netwal
Contact: Eric Ohrt
Construction start: 11/11/2024
Construction end: 6/10/2025
Description:
Mark Wyant has identified an issue with only one egress path from the south office corridor (door openings CC204, CC252, CC304 and CC352) that may impede the egress of mobility impaired individuals. We would like to have this situation reviewed. There may be potential conflicts with door swing, office door locations and fire ratings etc. Whatever solution is identified it should be reviewed with Troy Carey of EHS and may also require approval with the State Fire Marshal. Troy should be able to assist with that determination.
DURHAM-0092-362654-Lighting Replacements
Project Closeout
Room: 0092
Request date: 5/28/2024
Requested by: Robert Hade
Contact: Eric Ohrt
Construction start:
Construction end:
Description:
Multiple florescent lights are out in the shop room 92 and need the bulbs replaced or the fixtures swapped out to LED if possible.
DURHAM-0095-344753-Add IT Pod
Construction Documents
Room: 0095
Request date: 3/1/2024
Requested by: Robert Hade
Contact: Brian Grove
Construction start: 8/20/2024
Construction end: 2/18/2025
Description:
Add a new IT “pod” that needs dedicated cooling. Data center staff has designed a new pod layout to support high end research equipment. The pod will need a dedicated cooling system to manage the heat load created by the equipment. We need to install ACRC301S in row coolers that will connect back to the CDU. The CDU will need to be connected into the chilled water loops that support the data center. The CDU will connect to the in row with PEX pipe. Equipment has not been purchased yet as we need to confirm with the chilled water techs that we can install this system as we have designed. Please contact me if you'd like me to set up a meeting with the engineers on the APC side.
DURHAM-0101-363333-Please work with Brandi Latterell/Suzanne Fisher to develop a quick, high-level
Room: 0101
Request date: 5/20/2024
Requested by: Brandice Latterell
Contact: Eric Ohrt
Construction start:
Construction end:
Description:
Please work with Brandi Latterell/Suzanne Fisher to develop a quick, high-level cost estimate for the south half of the 1st floor of Durham. We will need a full design team to provide estimates for paint, carpet, lighting, construction of walls to create a few offices (also mechanical), relocation of existing and/or new furniture.
DURHAM-0317-334857-Desk
Project Closeout
Room: 0317
Request date: 1/3/2024
Requested by: Lynne Dubert
Contact: Jennifer Warrick
Construction start: 3/5/2024
Construction end: 5/17/2024
Description:
We would like to have a desk purchased for this room. It is for a new faculty member. We will want to meet with the person when they measure the space. Thank you/
DURHAM-General-336677-Heat Exchanger Study
Construction Documents
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Brian Grove
Construction start: 8/20/2024
Construction end: 2/18/2025
Description:
We would like to have the Engineering Team review the recent installation of the Heat Exchanger for code compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be shared with a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
DURHAM-GENERAL-365145-Office Relocation
Construction Documents
Room: General
Request date: 5/31/2024
Requested by: Suzanne Fisher
Contact: Carrie Choudhury
Construction start: 8/20/2024
Construction end: 2/18/2025
Description:
COM S will have their front door moving from Atanasoff to Durham. We toured the space on 5/30 with Carrie and Eric. The department chair is compiling a spreadsheet for a people move. They are requesting 2 project estimates. One for an initial move and another with more complex update and/or renovations. This impacts first floor south and 2 rooms in the lower level.
DURHAM-Information Technology Services-Design Standards Update
Room: General
Request date: 9/10/2019
Requested by: Michael Lohrbach
Contact: Michael Murray
Construction start:
Construction end:
Description: