DURHAM- General-218602-Egress Path
Schematic Design
Room: General
Request date: 8/29/2022
Requested by: John Netwal
Contact: John Byerly
Construction start: 7/15/2024
Construction end: 1/13/2025
Description:
Mark Wyant has identified an issue with only one egress path from the south office corridor (door openings CC204, CC252, CC304 and CC352) that may impede the egress of mobility impaired individuals. We would like to have this situation reviewed. There may be potential conflicts with door swing, office door locations and fire ratings etc. Whatever solution is identified it should be reviewed with Troy Carey of EHS and may also require approval with the State Fire Marshal. Troy should be able to assist with that determination.
DURHAM-0095-344753-Add IT Pod
Cost Range Approval
Room: 0095
Request date: 3/1/2024
Requested by: Robert Hade
Contact: Melissa Warg
Construction start: 7/5/2024
Construction end: 1/3/2025
Description:
Add a new IT “pod” that needs dedicated cooling. Data center staff has designed a new pod layout to support high end research equipment. The pod will need a dedicated cooling system to manage the heat load created by the equipment. We need to install ACRC301S in row coolers that will connect back to the CDU. The CDU will need to be connected into the chilled water loops that support the data center. The CDU will connect to the in row with PEX pipe. Equipment has not been purchased yet as we need to confirm with the chilled water techs that we can install this system as we have designed. Please contact me if you'd like me to set up a meeting with the engineers on the APC side.
DURHAM-0317-334857-Desk
Construction
Room: 0317
Request date: 1/3/2024
Requested by: Lynne Dubert
Contact: Josef Biechler
Construction start: 3/5/2024
Construction end: 9/3/2024
Description:
We would like to have a desk purchased for this room. It is for a new faculty member. We will want to meet with the person when they measure the space. Thank you/
DURHAM-0368-329280-Carpet Replacement
Project Closeout
Room: 0368
Request date: 12/4/2023
Requested by: Lynne Dubert
Contact: Josef Biechler
Construction start: 12/19/2023
Construction end: 3/5/2024
Description:
We need the carpet replaced in this room ASAP. We simply want the same carpet that is most readily available that ISU approves of.
DURHAM-0368-329382-Faculty Office Furniture
Project Closeout
Room: 0368
Request date: 12/5/2023
Requested by: Lynne Dubert
Contact: Josef Biechler
Construction start: 1/31/2024
Construction end: 3/5/2024
Description:
We would like to purchase a desk for a new faculty member as soon as possible. I understand you may need to measure the area, so let me know. We want a height adjustable desk and matching file cabinet for sure. We would also like 2 side chairs and perhaps a small round table.
DURHAM-C0382-265160-AED Cabinet with Metasys
Construction
Room: C0382
Request date: 3/1/2023
Requested by: Alex Wiley
Contact: Eric Ohrt
Construction start: 5/18/2023
Construction end: 4/26/2024
Description:
Install surface mount AED cabinet with Metasys DPS monitoring near the 3rd floor elevator.
DURHAM-General-336677-Heat Exchanger Study
Construction Documents
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Brian Grove
Construction start: 5/21/2024
Construction end: 11/19/2024
Description:
We would like to have the Engineering Team review the recent installation of the Heat Exchanger for code compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be shared with a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
DURHAM-Information Technology Services-Design Standards Update
Room: General
Request date: 9/10/2019
Requested by: Michael Lohrbach
Contact: Michael Murray
Construction start:
Construction end:
Description: