Current Projects in East Campus Parking Deck
Parking Lots 2026-Pavement Preservation
CP1280283
Initiated date: 5/12/2025
Contact: Angela Solberg
Description:
This project includes, but is not limited to, repairs to the East Campus Parking Deck structure; concrete patching at the lower entrance to the parking deck; and concrete reconstruction in a portion of Parking Lot 2. Underground utilities and lighting will also be evaluated and addressed as needed.