Current Projects in Food Sciences Building

FOOD SC- M0570-251222-PRV Vent Repair
On Hold
Room: M0570
Request date: 1/4/2023
Requested by: John Netwal
Contact: Denise Wulf
Construction start:
Construction end:
Description:
PRV feeding small section of FoodSc has only one Armstrong valve and is not properly vented. We need an engineer to determine what changes are necessary to correct these deficiencies (Mike and Brian know about this project)
FOOD SC-1598-442654-Estimate on Installing Trough Floor Drains
Schematic Design
Room: 1598
Request date: 5/20/2025
Requested by: Jordan Funkhouser
Contact: John Byerly
Construction start: 9/4/2025
Construction end: 3/5/2026
Description:
The ISU Brew Lab is ready to get a cost estimate on installing trough floor drains between the existing floor drains in the lab. We currently have temporary sink/wash down stations in the lab and desire to procure and install a permanent sink station on one of the exterior walls. We are upgrading vessels in the brew lab that will require more chilling capacity, and so we will also be sourcing and purchasing a stand-alone chiller system that we would like to install remotely if possible. The desired location will either be in an adjoining utility closet next to the lab or, potentially in the second-floor maintenance utility room next to the lab. This would require utility lines to be run through the wall. Considerations for the chiller would be either liquid cooled or air cooled, depending on the existing chilled water supply and locations. The last portion of our project includes either relocating or installing a new engineered work platform above current vessels as well as installing several of our existing vessels in an elevated configuration to take advantage of vertical work space in the lab. Once the project begins, we can provide the exact dimensions and layout of the work platform being considered. This platform is either already existing and would be relocated from the BCRF or internally designed and sent out for fabrication to be installed. This project request is to get location and design approval from FP&M and not the actual design, purchasing or installation. The sink and trough will need to be purchased and installed/managed by FP&M.
FOOD SC-1621-427177-Quote for Installing Permanent Connections to Autoclave
Construction Documents
Room: 1621
Request date: 3/3/2025
Requested by: Mitchel Michel
Contact: Donna Imhoff
Construction start: 7/11/2025
Construction end: 1/9/2026
Description:
Quote for installing permanent steam, cold water, and drainage connections to autoclave.
FOOD SC-2572-421870-Carpentry & Plumbing Remodel
Cost Range Approval
Room: 2572
Request date: 2/13/2025
Requested by: Cicero Cardoso Pola
Contact: Denise Wulf
Construction start: 8/31/2025
Construction end: 3/1/2026
Description:
Provide a quote for the removal of water, gas, and air faucets from some of the lab benches in rooms 2572 and 2593; replacing the door hinges and latches on the wood cabinets located on the south side of room 2572; and replacing the sink cabinet floor in both rooms 2572 and 2593 of the Food Sciences Building.
FOOD SC-2591-368918-Investigate Creamery Freezer Updates
Project Closeout
Room: 2591
Request date: 6/7/2024
Requested by: Sarah Canova
Contact: Eric Ohrt
Construction start:
Construction end:
Description:
As discussed in visit on 6/5, provide estimates to convert FSB#2591, #2568, and #1626A to freezers that would maintain -20F. Ideally, we would use only #2591 & #2568 as creamery ice cream freezers, but we'd like estimates for all 3 please.
FOOD SC-2nd Floor-434619-Repair Water Leak
Project Closeout
Room: General
Request date: 4/8/2025
Requested by: Lyle Bishop
Contact:
Construction start:
Construction end:
Description:
Correct leak in Food Science Hallway outside of the restroom on 2nd floor.
FOOD SC-C1500-396887-Window repairs or replacement
On Hold
Room: C1500
Request date: 10/15/2024
Requested by: Justin Abbott
Contact: Denise Wulf
Construction start:
Construction end:
Description:
Examine windows to Courtyard in corridors C1130 and C1500. There are 16 windows. The exterior sills and the lower jambs are rotting beyond repair. The glazing compound contains asbestos, and the paint will need to be tested for lead. This will need to be turned into a Project.
FOOD SC-General-389656-conservation of the History of Dairying fountainhead
Schematic Design
Room: General
Request date: 9/11/2024
Requested by: Sydney Marshall
Contact: Brady Streit
Construction start: 9/4/2025
Construction end: 3/5/2026
Description:
This project addresses the conservation of the History of Dairying fountainhead. It includes ongoing repair and reinstallation over the next year.