Current Projects in Food Sciences Building
FOOD SC- M0570-251222-PRV Vent Repair
Budget Approval
Room: M0570
Request date: 1/4/2023
Requested by:
Contact: Denise Wulf
Construction start: 5/15/2025
Construction end: 11/13/2025
Description:
PRV feeding small section of FoodSc has only one Armstrong valve and is not properly vented. We need an engineer to determine what changes are necessary to correct these deficiencies (Mike and Brian know about this project)
FOOD SC-1333-390288-Update Carpet and Paint
Project Closeout
Room: 1333
Request date: 9/17/2024
Requested by:
Contact: Brady Streit
Construction start: 12/20/2024
Construction end: 3/13/2025
Description:
Update carpet and paint, minor shops work (tear-out and patch/paint build-in cabinet) for the 1331-1339 office suite and one faculty office on the second floor. This is part of the overall LeBaron project faculty/staff moves. Please direct this project ATTN: Brady Streit.
FOOD SC-1621-427177-Quote for Installing Permanent Connections to Autoclave
Construction Documents
Room: 1621
Request date: 3/3/2025
Requested by:
Contact: Donna Imhoff
Construction start: 5/25/2025
Construction end: 11/23/2025
Description:
Quote for installing permanent steam, cold water, and drainage connections to autoclave
FOOD SC-1865A-434077-Repair-Replace Large Walk-in Cooler Door
Project Closeout
Room: 1865A
Request date: 4/2/2025
Requested by:
Contact:
Construction start:
Construction end:
Description:
Repair/replace the large walk-in cooler door in the pilot plant.
FOOD SC-2572-421870-Carpentry & Plumbing Remodel
Schematic Design
Room: 2572
Request date: 2/13/2025
Requested by:
Contact: Brian Grove
Construction start: 7/19/2025
Construction end: 1/17/2026
Description:
I would like to request a quote for the removal of water, gas, and air faucets from some of the lab benches in rooms 2572 and 2593 of the Food Sciences Building. Please contact me for more information at 515-294-0309 or cicerocp@iastate.edu
Additional location information: Room 2593
This would be a carpentry service. I would like to request a quote for replacing the door hinges and latches on the wood cabinets located on the south side of room 2572. Additionally, please include the costs for replacing the sink cabinet floor in both rooms 2572 and 2593 of the Food Sciences Building. Please contact me for more information at 515-294-0309 or cicerocp@iastate.edu.
Additional location information: room 2593
Work tags to attach: SG2700200
FOOD SC-2591-368918-Investigate Creamery Freezer Updates
Cost Range Approval
Room: 2591
Request date: 6/7/2024
Requested by:
Contact: Denise Wulf
Construction start: 7/9/2025
Construction end: 1/7/2026
Description:
As discussed in visit on 6/5, provide estimates to convert FSB#2591, #2568, and #1626A to freezers that would maintain -20F. Ideally, we would use only #2591 & #2568 as creamery ice cream freezers, but we'd like estimates for all 3 please.
FOOD SC-2nd Floor-434619-Repair Water Leak
Construction Documents
Room: General
Request date: 4/8/2025
Requested by:
Contact:
Construction start: 6/17/2025
Construction end: 12/16/2025
Description:
We have an issue with a leak in Food Science Hallway outside of the restroom on 2nd floor. We have done some minor work to prevent a major leak but are still not sure about where the leak is originating exactly. There is a bucket underneath that has been catching the leak currently.
Ruth MacDonald, the Associate Dean for Personnel and Finance at FSHN has called to inquire about escalating this to get it repaired sooner than later. She said that it looks bad to have this issue with new students touring and donors walking through.
FOOD SC-C1500-396887-Window repairs or replacement
On Hold
Room: C1500
Request date: 10/15/2024
Requested by:
Contact: Denise Wulf
Construction start: 6/17/2025
Construction end: 12/16/2025
Description:
Examine windows to Courtyard in corridors C1130 and C1500. There are 16 windows. The exterior sills and the lower jambs are rotting beyond repair. The glazing compound contains asbestos, and the paint will need to be tested for lead. This will need to be turned into a Project.
FOOD SC-General-389656-conservation of the History of Dairying fountainhead
Schematic Design
Room: General
Request date: 9/11/2024
Requested by:
Contact: Brady Streit
Construction start: 7/19/2025
Construction end: 1/17/2026
Description:
I'm not sure if I filled in the above part correctly, but I am looking for a project manager to be assigned and a project created for the conservation of the History of Dairying fountainhead. Preferably the project manager would be Brady Streit, as he has already helped with the project. I would need a Worktag assigned to the project, and the beginnings of a project for ongoing repair and reinstallation over the next year or so.
Please contact me with other questions.