Current Projects in Barbara E Forker Building
FORKER-0142-349895-Remodel
Project Closeout
Room: 0142
Request date: 3/28/2024
Requested by:
Contact: Mick McBride
Construction start: 9/3/2024
Construction end: 4/8/2025
Description:
Cabinet repairs or replacement, replace flooring and update lighting.
142 Cabinets:
I’d like to request a quote for the following repairs:
1.) Replace all base cabinet doors and drawers throughout Forker 142. Many are water-damaged and non-functional. OR replacing the entire cabinets pieces.
2.) Replace the wooden sliding-doors on the upper cabinets with tempered glass sliding-doors.
142 Floors:
I’d like to request a quote for replacing the flooring and vinyl wall base throughout the Forker 142 lab space. Similar tile flooring is preferred.
Lighting:
I’d like to request a quote from the lighting maintenance team on replacing/updating lighting in Forker 142. I’d like to replace the current fluorescent bulbs with LED bulbs (and compatible ballasts).
Please note: Forker 142 is an active lab with ongoing scheduled research so consideration will have to be given to scheduling work within the space to avoid disruption to research activities.
FORKER-S0312-398707-Repair water damage to exterior walls
Schematic Design
Room: S0312
Request date: 11/7/2024
Requested by:
Contact: Brady Streit
Construction start: 7/19/2025
Construction end: 1/17/2026
Description:
previous water damage in exterior wall