Current Projects in Gerdin Business Building

GERDIN- General-213979-West Walkway Repairs
Project Closeout
Room: General
Request date: 8/2/2022
Requested by: Chris Joens
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
West Granite Walkway outside of 1155. Talked with Barb Steiner about this briefly. Would like to get a quote for removing and releveling the walk, repairing broken walkway blocks, making any repairs to the heating system below (if needed).
GERDIN- General-265706-Wayfinding Signage & Panel Undergrad Office
Construction Documents
Room: General
Request date: 3/7/2023
Requested by: Chris Joens
Contact: Joseph Stoberl
Construction start: 7/28/2025
Construction end: 1/26/2026
Description:
Attn Joe Stoberl: We are wanting to update wayfinding signage in Gerdin - add additional wayfinding in the new addition to help visitors and students navigate the building. Will attach a list that we have identified, and would like to set up a meeting to discuss parameters and if we can work with ISU Printing to produce the signage. 6/12/2023 - Adding Scope Install large panel outside the undergraduate office in the Gerdin Business Building
GERDIN-0160-391352-Remove lockers and replace with seating.
Bidding
Room: 0160
Request date: 9/26/2024
Requested by: Chris Joens
Contact: Mitchell Hlavacek
Construction start: 7/3/2025
Construction end: 1/1/2026
Description:
We would like to remove the lockers on Ground Floor Gerdin, and replace with bench seating
GERDIN-0330-350961-Classroom Signage
Construction Documents
Room: 0330
Request date: 3/29/2024
Requested by: Kathleen Baumgarn
Contact: Joseph Stoberl
Construction start: 7/28/2025
Construction end: 1/26/2026
Description:
We have a classroom in Gerdin that needs new signage outside of the classroom. There are two doors into the classroom, so we will need two signs. Following is the information that needs to be on these signs. Please include braille on the sign. 0330 Skinner Classroom
GERDIN-1122-382790-Student Study Space
Project Closeout
Room: 1122
Request date: 8/13/2024
Requested by: Chris Joens
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
We're envisioning a space that is 1/3 computer lab and the remainder to be study space dedicated to the students. Part of the project is to rehome the tall tables and chairs from the Kingland Hub (1450 Gerdin)to help save on some furniture costs, but we would be looking at a pretty large remodel here. New flooring, paint, (potentially) lighting, and new furniture aside from the items we repurpose from Kingland.
GERDIN-1420-422393-Enclose Front Space, East Cubicle with Taller Walls
Construction
Room: 1420
Request date: 2/19/2025
Requested by: Christian Joens
Contact: Amy Tremain
Construction start: 5/30/2025
Construction end: 7/3/2025
Description:
This is a continuation of a closed project(392457) to get the same design time together to not duplicate work. We want: Lacy's cubicle (front space, east cubicle) enclosed with taller walls. The back two cubicles to have taller walls (only seating the two existing workstations)
GERDIN-2211-441794-Roller shades
Construction
Room: 2211
Request date: 5/12/2025
Requested by: Christian Joens
Contact: Brandon Kadner
Construction start: 6/17/2025
Construction end: 8/15/2025
Description:
We would like to install roller shades in the two windows in this office - the way the space has to be arranged makes it difficult for users to adjust the miniblinds.
GERDIN-2222-443868-Workstations
Construction Documents
Room: 2222
Request date: 5/29/2025
Requested by: Christian Joens
Contact: Judy Dugan
Construction start: 8/13/2025
Construction end: 2/11/2026
Description:
We would like to reconfigure this area to house as many workstations as possible. Most are larger than they need to be currently, and considering taller walls on the interior portion while leaving lower walls on window side. (project spans 2221/2222 space)
GERDIN-2228-449089-Remodel Kitchenette
Construction Documents
Room: 2228
Request date: 6/18/2025
Requested by: Christian Joens
Contact: Judy Dugan
Construction start: 8/29/2025
Construction end: 2/27/2026
Description:
Attn: Brandon Kadner Remodel kitchenette area to make marketing prep and printing area
GERDIN-2nd Floor-435776-2117, 2118, 2127, 2128, 2133, 2134, carpet, baseboard, risers, & stairnose
Construction
Room: General
Request date: 4/22/2025
Requested by: Christian Joens
Contact: Amy Tremain
Construction start: 6/17/2025
Construction end: 7/31/2025
Description:
Replace carpet, baseboard, risers, and stairnose in the following seminar rooms and classrooms - July 2025: 2117 & 2118 (seminar rooms), 2127, 2128, 2133, 2134 (general university classrooms) Room scheduling and the Provost's office are supportive of this work, and have been communicated with prior to this request. We will need to keep those parties informed of the schedule.
GERDIN-3375-442799-Remove and Replace Carpet and Baseboard
Construction
Room: 3375
Request date: 5/22/2025
Requested by: Christian Joens
Contact: Amy Tremain
Construction start: 6/17/2025
Construction end: 7/3/2025
Description:
Remove old roll carpet and baseboard and replace with squares and cove base - Brand: Shaw, Style: Disperse, Color: Voyage (brown), installed: ashlar We would like this installed by a contractor - could pair with the classrooms installs in July. We have more than enough attic stock (located in Gerdin basement, will be brought up for the contractor) of both the carpet + base that can be used for this project.
GERDIN-Exterior-434942-Window Cleaning
Construction
Room: General
Request date: 4/16/2025
Requested by: Christian Joens
Contact: Brandon Kadner
Construction start: 6/17/2025
Construction end: 8/15/2025
Description:
We would like to contract exterior window cleaning for this summer. Please provide an estimate before scheduling. Thanks!
GERDIN-GENERAL-377216-7ft Cubicle Walls & Locking Doors
Project Closeout
Room: General
Request date: 7/25/2024
Requested by: Chris Joens
Contact: Jennifer Warrick
Construction start: 3/3/2025
Construction end: 5/27/2025
Description:
We would like to get costs and drawings to purchase 7ft cubicle walls + locking doors for the following spaces on 3rd floor Gerdin: 3151, 3252, 3324. Pre-addition, we had the same sort of set up in these locations, but took down the walls and they are being used elsewhere now.
GERDIN-Rms 1301 and 2320-434941-Chairs
Construction
Room: General
Request date: 4/11/2025
Requested by: Christian Joens
Contact: Brandon Kadner
Construction start: 6/17/2025
Construction end: 8/1/2025
Description:
We would like to update the chairs in two conference rooms: 1301 and 2320 to the Herman Miller Verus chairs that we have in the rest of our spaces. 1301 has 16 seats, 2320 has 20.
GERDIN-Rms 2117, 3164, 2110, 2115, 2155, 2170, 0110, 0140, 0440, 0460-434952-Painting
Construction
Room: General
Request date: 4/11/2025
Requested by: Christian Joens
Contact: Brandon Kadner
Construction start: 6/17/2025
Construction end: 12/16/2025
Description:
We would like to contract out painting this summer for the following areas to freshen up the spaces from scuffs and wall dings: Seminar room 2117 Seminar room 3164 2nd floor hall 2110, 2115, 2155, 2170 Ground floor hall 0110, 0140, 0440, 0460