Current Projects in Gerdin Business Building

GERDIN- General-213979-West Walkway Repairs
On Hold
Room: General
Request date: 8/2/2022
Requested by: Chris Joens
Contact: Melissa Warg
Construction start: 7/12/2024
Construction end: 1/10/2025
Description:
West Granite Walkway outside of 1155. Talked with Barb Steiner about this briefly. Would like to get a quote for removing and releveling the walk, repairing broken walkway blocks, making any repairs to the heating system below (if needed).
GERDIN- General-265706-Wayfinding Signage & Panel Undergrad Office
Construction Documents
Room: General
Request date: 3/7/2023
Requested by: Chris Joens
Contact: Joseph Stoberl
Construction start: 5/28/2024
Construction end: 11/26/2024
Description:
Attn Joe Stoberl: We are wanting to update wayfinding signage in Gerdin - add additional wayfinding in the new addition to help visitors and students navigate the building. Will attach a list that we have identified, and would like to set up a meeting to discuss parameters and if we can work with ISU Printing to produce the signage. 6/12/2023 - Adding Scope Install large panel outside the undergraduate office in the Gerdin Business Building
GERDIN-0115-336460-New Classroom Seating
Construction
Room: 0115
Request date: 1/19/2024
Requested by: Chris Joens
Contact: Jennifer Warrick
Construction start: 5/1/2024
Construction end: 10/30/2024
Description:
Upholstery on seats in this seminar room are showing considerable wear and we would like to price out reupholstering (if able) or replacing seats (if we can maintain the current capacity).
GERDIN-0169-280242-Carpet Replacement
Project Closeout
Room: 0169
Request date: 5/12/2023
Requested by: Chris Joens
Contact: Melissa Warg
Construction start: 6/23/2023
Construction end: 9/13/2023
Description:
Remove old carpet and base, and replace with new brown squares (use from stock in basement) and new cove base. Would like to do this in July
GERDIN-0330-350961-Classroom Signage
Construction Documents
Room: 0330
Request date: 3/29/2024
Requested by: Kathleen Baumgarn
Contact: Joseph Stoberl
Construction start: 6/7/2024
Construction end: 12/6/2024
Description:
We have a classroom in Gerdin that needs new signage outside of the classroom. There are two doors into the classroom, so we will need two signs. Following is the information that needs to be on these signs. Please include braille on the sign. 0330 Skinner Classroom
GERDIN-1360-343405-Furniture
Budget Approval
Room: 1360
Request date: 2/23/2024
Requested by: Joens, Chris
Contact: Melissa Warg
Construction start: 5/18/2024
Construction end: 11/16/2024
Description:
We would like to get some additional seating to match what was purchased in summer 2021 - trying to maximize number of seats in this space. We would also like to get a credenza or shelving to match the side tables.
GERDIN-2200-252852-Reconfiguration of Cubicle Spaces
Construction
Room: 2200
Request date: 1/19/2023
Requested by: Chris Joens
Contact: Jennifer Warrick
Construction start: 4/16/2024
Construction end: 10/15/2024
Description:
We would like to get cost range estimates and schematics reconfiguration of admin cubicle spaces in the Dean's Suite.
GERDIN-General-330154-Furniture Warranty
Construction
Room: General
Request date: 12/15/2023
Requested by: Chris Joens
Contact: Jennifer Warrick
Construction start: 4/24/2024
Construction end: 10/23/2024
Description:
Attn: Leigh Wiand - Chair warranty in several Gerdin Classrooms w/ Pigott