Current Projects in Hach Hall

HACH-0204-356387-Lab Equipment Relocation & Electric
Schematic Design
Room: 0204
Request date: 4/22/2024
Requested by: Theresa Windus
Contact: Troy Bowers
Construction start: 7/27/2024
Construction end: 1/25/2025
Description:
Modifications to both the 3rd floor lab (minimal, if any) and the basement lab regarding equipment that needs to be relocated from one floor to another at Hach Hall. The basement lab room 0204 spare electrical circuit availability in panels R2BF and R2BF (sec2) is very limited (8 open circuits total) for future use.
HACH-0214-246667-Remodel
Project Closeout
Room: 0214
Request date: 12/16/2022
Requested by: David Appy
Contact: Josef Biechler
Construction start:
Construction end:
Description:
HIGH PRIORITY As part of an ongoing negotiation with a senior hire candidate, the Chemistry Department would like a rapid ballpark estimate for renovations to lab 0214 Hach. Only a rough estimate is required, and time is of the essence. DAVID APPY can meet someone on site if that is helpful. dvappy@iastate.edu, 310-699-3697. Items -Curtained areas will be walled off into separate rooms. -One of the new small rooms will be divided into two smaller rooms. -Removal of, say 12 of the items along the south wall. -Possible installment of autoclave. -Installment of ~10 lab benches with electrical hookups. -Benches may have to be purchased. Could this be included in the estimate? Please call/email David Appy for questions. dvappy@iastate.edu, 310-699-3697 I have wide availability today (1216) and early next week. The Account given is just to get things started. I will have an update for that info.
HACH-General-335892-Flood Damage Repair
Construction Documents
Room: General
Request date: 1/16/2024
Requested by: Michelle Lenkaitis
Contact: John Byerly
Construction start: 5/26/2024
Construction end: 11/24/2024
Description:
Flood Damage Repair