Current Projects in Hach Hall
HACH-0204-356387-Lab Equipment Relocation & Electric
Project Closeout
Room: 0204
Request date: 4/22/2024
Requested by:
Contact: Eric Ohrt
Construction start: 12/12/2024
Construction end: 3/12/2025
Description:
Modifications to both the 3rd floor lab (minimal, if any) and the basement lab regarding equipment that needs to be relocated from one floor to another at Hach Hall. The basement lab room 0204 spare electrical circuit availability in panels R2BF and R2BF (sec2) is very limited (8 open circuits total) for future use.
HACH-4200-410334-Air Compressor Replacement(s)
Schematic Design
Room: 4200
Request date: 12/9/2024
Requested by:
Contact: Brian Grove
Construction start: 7/20/2025
Construction end: 1/18/2026
Description:
Air Compressors ACU1 & ACU2 are not working with Drive Overload failures. Would like cost estimates for repairs of ACU1 & ACU2 and options of replacements of ACU1, ACU2, and AC-3.