Current Projects in Heady Hall

HEADY-0080-302996-Wall Repair
Construction
Room: 0080
Request date: 8/21/2023
Requested by: Karen Kovarik
Contact: Jennifer Warrick
Construction start: 4/19/2024
Construction end: 8/16/2024
Description:
This started with FPM Building Maintenance and transferred to FDC Projects per Justin Abbott. Original Work Order #252000 Window doesn't latch. Drywall is damaged from window being open when it snowed. Per Justin Abbott: Water is coming in through the walls. Outside needs to be graded away from the building. 10/17/2023 - FPM Shops will be handling the service request for outside grading work.
HEADY-Room 0382-Remodel
Construction Documents
Room: 0382A
Request date: 10/14/2021
Requested by: Karen Kovarik
Contact: John Byerly
Construction start: 5/24/2024
Construction end: 11/22/2024
Description:
We would like to redesign the Heady 382 suite and turn that into a graduate student lounge. We would like to meet with somebody to discuss a plan, and come up with an estimate for the project. Please call me at 515-294-6740 or send me an email to schedule when a designer/contractor can meet.