Current Projects in Hilton Coliseum
HILTON-General-377042-Relocate Statue
Project Closeout
Room: General
Request date: 7/23/2024
Requested by:
Contact: Brady Streit
Construction start:
Construction end:
Description:
To relocate the Johnny’s statue in Spring 2025. Location TBD by Athletics.
Attn: Jon Harvey and Steve Nelson as they have been involved in these discussions.
HILTON-General-390128-South Exterior Stairwell of Hilton Coliseum
Project Closeout
Room: General
Request date: 9/16/2024
Requested by:
Contact: Brady Streit
Construction start:
Construction end:
Description:
Can you please submit a capital project/service request to repair and/or replace the south exterior stairwell of Hilton Coliseum.
Please also request to close CP1195000
HILTON-General-397196-Investigate Hilton Concrete Floor Cracks
Project Closeout
Room: General
Request date: 10/23/2024
Requested by:
Contact: Brady Streit
Construction start:
Construction end:
Description:
ATTN BRADY STREIT:
PLEASE WORK WITH MILES PANKONEN TO INVESTIGATE HILTON CONCRETE FLOOR CRACKS ON SOUTH SIDE INNER AND OUTER CONCOURSE
HILTON-General-416454-Room 0385 Replace Door 0385-3 & 0385-4
Construction
Room: General
Request date: 1/22/2025
Requested by:
Contact:
Construction start: 4/1/2025
Construction end: 9/30/2025
Description:
To re-do door on east side of Johnny’s to allow to be used for entrance (door is currently exit only door). We may also want to add some additional outlets for food serving stations.