Current Projects in King Pavilion

KING PV-0735-390908- Make Windows operable.
Schematic Design
Room: 0735
Request date: 9/23/2024
Requested by:
Contact: Troy Bowers
Construction start: 7/20/2025
Construction end: 1/18/2026
Description:
Sending to the Projects Desk - Beyond the scope of the Shops. We would like have someone out to take a look at windows around the roof line. They use to be operated by a switch on the wall. The system had issues before and fpm took out the switch to control them. We are receiving complaints that kp is too now since we cant open them. So we would like to know what needs to happen to make them operational again.
KING PV-0756-245641-Remodel
On Hold
Room: 0756
Request date: 12/2/2022
Requested by:
Contact: Alexa Peters
Construction start: 7/20/2025
Construction end: 1/18/2026
Description:
We would like to replace desks and chairs in this room. Desks: 54"x30" height adjustable (manual) with butcher block tops. Chairs: height adjustable to desks, no arms Review storage space in the current area. This will encompass the west side of the King Pavilion on the lower floor. Will want to add monitors at some point so electrical plan needed also.