Current Projects in Landscape Architecture

L A- General-289829-2nd Floor Lighting
Schematic Design
Room: General
Request date: 6/26/2023
Requested by: Tony Thrush
Contact:
Construction start: 6/26/2025
Construction end: 6/26/2025
Description:
Install new lighting on the second floor.
L A-General-338224-Fire Escape Repairs
On Hold
Room: General
Request date: 1/30/2024
Requested by: John Netwal
Contact: Denise Wulf
Construction start: 6/25/2025
Construction end: 6/25/2025
Description:
Fire Escape Repairs - The Inspection Report is in the LX Folder and G Drive folder.
L A-General-376777-Vinyl Window Graphics
Project Closeout
Room: General
Request date: 7/19/2024
Requested by: Tony Thrush
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Print and install vinyl window graphics for Iowa State Daily and Model Farm - place adhesive vinyl at each of the three doors to the building (south, west and north).
L A-General-435873-2nd and 3rd Floor Window Cleaning
Bidding
Room: General
Request date: 4/23/2025
Requested by: Sarah Lefeber
Contact:
Construction start: 6/27/2025
Construction end: 12/26/2025
Description:
Clean inside and outside of the windows on the 2nd and 3rd floor in the Landscape Architecture Building.