Current Projects in Landscape Architecture
L A- General-289829-2nd Floor Lighting
Schematic Design
Room: General
Request date: 6/26/2023
Requested by:
Contact:
Construction start: 5/10/2025
Construction end: 5/10/2025
Description:
Install Carpet on the first floor plus in the following rooms 0204, C0100, C0200, and C0210.
4/22/2024 - Change in Scope
Tony with the Daily is not going to do this carpet project any more but is going to switch gears and consider new lighting. ISU Daily 2nd floor Open office lighting - switch ceiling mounted light fixtures to low profile led fixtures.
L A-General-338224-Fire Escape Repairs
Budget Approval
Room: General
Request date: 1/30/2024
Requested by:
Contact: Denise Wulf
Construction start: 5/16/2025
Construction end: 11/14/2025
Description:
Fire Escape Repairs - The Inspection Report is in the LX Folder and G Drive folder.
L A-General-376777-Vinyl Window Graphics
Project Closeout
Room: General
Request date: 7/19/2024
Requested by:
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Print and install vinyl window graphics for Iowa State Daily and Model Farm - place adhesive vinyl at each of the three doors to the building (south, west and north).
L A-General-435873-2nd and 3rd Floor Window Cleaning
Construction Documents
Room: General
Request date: 4/23/2025
Requested by:
Contact:
Construction start: 7/9/2025
Construction end: 1/7/2026
Description:
We would like all the windows cleaned on the 2nd and 3rd floor of the Landscape Architecture Building, on the inside and outside of the windows. Our worktag number is PG102953