Current Projects in Parks Library

LIBRARY- General-287240-Lighting
Construction
Room: General
Request date: 6/14/2023
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start: 1/8/2024
Construction end: 7/8/2024
Description:
Please start a project request to have the the 7 tier contactors switch over to metasys to be able to control the lighting. Please refer to Mike McCoy as he is familiar with the situation.
LIBRARY- General-300950-Grounding Improvements
Project Closeout
Room: General
Request date: 8/4/2023
Requested by: Brady Streit
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Building grounding system. The past electrical manager was tasked with obtaining a quote from DDM for this work. When I contacted them they told me that there was never a request from FP&M for a quote. Moving forward we will need a written scope of work for the grounding improvements before we can get a price from a contractor. This is something that we would not do in house at this time so this can go to the design team. I was told that Brian Dangelser and Mike Olson have more knowledge on the subject.
LIBRARY- General-309550-Tiers Lighting Replacement
Project Closeout
Room: General
Request date: 9/12/2023
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Please start a new project request for Parks Library. We would like to go over lighting options for all 7 tiers. We would like Troy Bowers to be the electrical engineer on the project. We would like to meet with several vendors (3E and M&M) to go over options for replacement lighting in all of the tiers.
LIBRARY-0002-302202-Skylight or Foundation Repairs
Schematic Design
Room: 0002
Request date: 8/15/2023
Requested by: Justin Nolting
Contact: Bruce Bonestroo
Construction start: 7/15/2024
Construction end: 1/13/2025
Description:
FPM, Brandon Bartleson worked on this in Mid July and patched the exterior wall but this is still leaking. 293958 was the original work request that has already been closed out. Please look into this farther. Below the two large skylights in the SE corner of 002, and in the SE corner of the study rooms 003 and 004 after a rain the carpet is always wet from the wall to about 2' out. The wall is not visibly wet or dripping when this happens. We have had issue before judging by the peeling paint and multiple caulking jobs to the glass. This seems to be a foundation issue that needs to be addressed. Area is close to storm drain that has issues holding water or being clogged. See Justin Nolting or Shane Baumler for more information.
LIBRARY-0005-287228-Walk In Freezer Refrigerator
Project Closeout
Room: 0005
Request date: 6/14/2023
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Please start a project request to have space on ground floor room 005 be looked at for a possible walk in freezer/refrigerator location. This will be to explore options for film storage that is slowly deteriorating and needs a cool climate to slow the process. Use PG103217 for worktag.
LIBRARY-0033A-348328-ITS Sign Replacement
Construction Documents
Room: 0033A
Request date: 3/6/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 5/21/2024
Construction end: 11/19/2024
Description:
Please remove the "Library IT Support" wall sign outside room 0074. Please make new sign that reads "Library IT Support" and hang sign outside 0033A. Use PG103216 for worktag. See Justin Nolting or Shane Baumler for more detail.
LIBRARY-0036-310813-Sprinkler System Replacement
Project Closeout
Room: 0036
Request date: 9/22/2023
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Please provide a cost range for a replacement sprinkler system in Stacks Area 036 and 035. This would be to develop a plan for eventual coverage of future compact shelving in the area. We need to look at the possibility of raising the ceiling as well for 18 clearance of shelving. See Justin Nolting for more info. Use PG103217 for worktag
LIBRARY-0084-343476-ADA Sign
Construction Documents
Room: 0084
Request date: 2/23/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 5/21/2024
Construction end: 11/19/2024
Description:
Please make ADA sign for Room 084. Standard size will work great. Use PG103216 for work tag. See Justin or Shane for more info.
LIBRARY-0106-349576-Room Sign
Construction Documents
Room: 0106
Request date: 3/22/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 5/31/2024
Construction end: 11/29/2024
Description:
Please make ADA sign for room 106. The sign will probably need to be stuck on the glass by the door entry. Use work-tag PG103216 if necessary. See Justin or Shane for more details.
LIBRARY-0198-315915-Sound Dampening Panels, Paint and Carpet
Bidding
Room: 0198
Request date: 10/5/2023
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start: 4/26/2024
Construction end: 10/25/2024
Description:
Please start a project request to add sound dampening acoustic panels to room 198. This is the original building and would be attaching to original plaster. Please consult with university architect as well making sure these changes are approved. Use PG103216 for worktag for project. Scope Increase: Paint & Carpet
LIBRARY-0373-287231-Carpet and Paint
Construction
Room: 0373
Request date: 6/14/2023
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start: 2/20/2024
Construction end: 8/20/2024
Description:
Please start a project request for room 373 for new carpet and paint. Ideally, we would like the carpet to match the carpet that will be installed in the staff lounge room 381 for PR1166732.
LIBRARY-0373-341952-Sign Replacement
Construction Documents
Room: 0373
Request date: 2/8/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 5/21/2024
Construction end: 11/19/2024
Description:
Please make new ADA sign for room 373 that reads: 0373 Human Resources Please remove old sign and replace with new. Work tags to attach: PG103216
LIBRARY-0374-341951-Sign Replacement
Construction Documents
Room: 0374
Request date: 2/8/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 5/21/2024
Construction end: 11/19/2024
Description:
Please make new ADA sign for room 374 that reads: 0374 Student Success & Retention Office of the Senior Vice President & Provost Please remove old sign and replace with new. Work tags to attach: PG113128, DD03056
LIBRARY-0375-341950-Sign Replacement
Construction Documents
Room: 0375
Request date: 2/7/2024
Requested by: Justin Nolting
Contact: Joseph Stoberl
Construction start: 5/21/2024
Construction end: 11/19/2024
Description:
Please make new ADA sign for room 375 that reads: 0375 Student Success & Retention Office of the Senior Vice President & Provost Please remove old sign and replace with new. Work tags to attach: PG113128, DD03056
LIBRARY-0381-281505-Remodel
Project Closeout
Room: 0381
Request date: 5/24/2023
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start:
Construction end:
Description:
Please start a project request to have the library staff lounge updated. We are looking to add new furniture, carpet, paint, and possibly remodeling the kitchenette area. For the first meeting please invite Hilary Seo and Brent Swanson.
LIBRARY-General-315981-Tiers Carrel Lighting and Receptacle
Schematic Design
Room: General
Request date: 10/6/2023
Requested by: Justin Nolting
Contact: Steve Larson
Construction start: 7/15/2024
Construction end: 1/13/2025
Description:
Please start a project request for all 7 tiers in Parks library. We would like the lighting in the carrels updated to LED and also an electrical surface mounted outlet with USB-C capability. There is roughly 29 carrels per level. Please use PG103216 for worktag. Jenny Warrick - Project Manager and Troy Bowers - Electrical Engineer are to be on the project.
LIBRARY-General-336660-Water Heater Study
Schematic Design
Room: General
Request date: 1/22/2024
Requested by: John Netwal
Contact: Mike McCoy
Construction start: 7/15/2024
Construction end: 1/13/2025
Description:
We would like to have the Engineering Team review the recently installed Water Heater for Code Compliance and safety in the mechanical room and develop a detailed plan to correct any deficiencies found that could be either shared with a contractor or in-house staff. An engineering probable cost estimate would be appreciated.
LIBRARY-GENERAL-342470-Test Program Amobi Desk
Construction
Room: General
Request date: 2/14/2024
Requested by: Justin Nolting
Contact: Jennifer Warrick
Construction start: 4/24/2024
Construction end: 10/23/2024
Description:
Please direct this project directly to Judy Dugan. We would like to use the Amobi pilot program to place an "Amobi Desk" and "Amobi Team" in the NW corner of 2nd floor "RM240" and the NW corner of 3rd floor "RM350". This is a test program and there should be no cost to the Library associated with this. See Brent Swanson, Shane Baumler, or Justin Nolting for more detail.
LIBRARY-M0092C-341506-Hydraulic Calculation Plate
Construction Documents
Room: M0092C
Request date: 4/19/2024
Requested by: Alex Wiley
Contact: Brian Grove
Construction start: 6/28/2024
Construction end: 12/27/2024
Description:
Parks Library Rm M0092C Provide hydraulic calculation plate for west riser (1980s) design area at the bottom of the riser in room M0092C. This is a result of 2024 Fire Marshall Inspection
LIBRARY-M0092C-341507-Riser Control Valve Labeling
Schematic Design
Room: M0092C
Request date: 4/19/2024
Requested by: Alex Wiley
Contact: Brian Grove
Construction start: 7/16/2024
Construction end: 1/14/2025
Description:
Parks Library, Rm M0092C Riser control valve labeling needs to be adjusted to reflect sprinkler system changes. Some of the building wet zones are now on the Tiers Riser, so "Tiers" and "Main Building" tables are no longer accurate. Labeling should be as clear an unambiguous possible.