Current Projects in Lied Recreation Athletic Center

LIED-0134-309388-Dryer Vent Relocation
On Hold
Room: 0134
Request date: 9/8/2023
Requested by: Garry Greenlee
Contact: Denise Wulf
Construction start: 9/20/2025
Construction end: 3/21/2026
Description:
Investigate and determine with cost estimate if it is possible to vent the laundry room dryer vents up through the ceiling instead of below the floor. John Byerly is familiar with this request.
LIED-GENERAL-399237-Exterior Repair
Construction
Room: General
Request date: 11/6/2024
Requested by: Garry Greenlee
Contact: Mitchell Hlavacek
Construction start: 6/5/2025
Construction end: 12/4/2025
Description:
Dan Sloan and Brandi Latterell are familiar with this request. Exterior repair/replacement are needed to minimize foundation issues at the Lied Recreation Athletics Center. Repair/replacement of the DMU infill and flashing a the top of the exterior wall on the west sided of the training room.
LIED-GENERAL-399245-Replace doors and frames
Project Closeout
Room: General
Request date: 11/6/2024
Requested by: Garry Greenlee
Contact: Mitchell Hlavacek
Construction start: 4/3/2025
Construction end: 7/3/2025
Description:
Dan Sloan and Brandi Latterell are familiar with this request. Interior of Lied Recreation Athletic Center multiple doors and frames need replaced. Frames must be able to withstand slab movement without affecting the function of the doors. Block walls need to be replaced with light weight metal framing and wallboard. All work must be done from May 15-August 15. It is possible to split into phase if needed. See attachment on specific locations, doors, and walls.
LIED-General-415996-Remove Trees
Schematic Design
Room: General
Request date: 1/16/2025
Requested by: Alexa Peters
Contact: Rhonda Martin
Construction start: 9/20/2025
Construction end: 3/21/2026
Description:
Dan Sloan and Brandi Latterell are familiar with this request. Exterior repair/replacement are needed to minimize foundation issues at the Lied Recreation Athletics Center. Trees need to be removed and replaced with lesser invasive vegetation to minimize roots from removing moisture from under the foundation.
LIED-General-422330-Replace Lied Rec Sauna
Construction
Room: General
Request date: 2/18/2025
Requested by: Andrew Kautman
Contact: Eric Ohrt
Construction start: 4/28/2025
Construction end: 10/27/2025
Description:
Replace Lied Rec sauna for ISU wrestling team.
LIED-General-430634-Cement Pad for Dumpster
Project Closeout
Room: General
Request date: 3/31/2025
Requested by: Garry Greenlee
Contact: Amy Tremain
Construction start: 10/19/2025
Construction end: 5/18/2026
Description:
We have two dumpsters at Lied on the west end of the building. One is on the mulch bedding and looks bad. Can we look at putting in a cement pad down for it to sit on? Is there any way we can mask (hide) that dumpster? I would like an estimate on this cost and thoughts about what could make it look more appealing.
LIED-X0130A-415512-Zone Temp Sensors Installed
Construction
Room: X0130A
Request date: 1/14/2025
Requested by: Casey Bubke
Contact: Amy Tremain
Construction start: 7/1/2025
Construction end: 10/9/2025
Description:
Rooms/Spaces: X0130A, X0110A, M0120A, M0120. Would like cost estimate of getting Johnson Controls zone temperature sensors installed in these spaces.