Current Projects in Lied Recreation Athletic Center
LIED-GENERAL-399237-Exterior Repair
Construction Documents
Room: General
Request date: 11/6/2024
Requested by:
Contact: John Byerly
Construction start: 5/25/2025
Construction end: 11/23/2025
Description:
Dan Sloan and Brandi Latterell are familiar with this request. Exterior repair/replacement are needed to minimize foundation issues at the Lied Recreation Athletics Center. Repair/replacement of the DMU infill and flashing a the top of the exterior wall on the west sided of the training room.
LIED-GENERAL-399245-Replace doors and frames
Construction
Room: General
Request date: 11/6/2024
Requested by:
Contact: Mitchell Hlavacek
Construction start: 4/3/2025
Construction end: 10/2/2025
Description:
Dan Sloan and Brandi Latterell are familiar with this request. Interior of Lied Recreation Athletic Center multiple doors and frames need replaced. Frames must be able to withstand slab movement without affecting the function of the doors. Block walls need to be replaced with light weight metal framing and wallboard. All work must be done from May 15-August 15. It is possible to split into phase if needed. See attachment on specific locations, doors, and walls.
LIED-General-415996-Remove Trees
Schematic Design
Room: General
Request date: 1/16/2025
Requested by:
Contact: Rhonda Martin
Construction start: 7/19/2025
Construction end: 1/17/2026
Description:
Dan Sloan and Brandi Latterell are familiar with this request. Exterior repair/replacement are needed to minimize foundation issues at the Lied Recreation Athletics Center. Trees need to be removed and replaced with lesser invasive vegetation to minimize roots from removing moisture from under the foundation.
LIED-General-422330-Replace Lied Rec Sauna
Construction
Room: General
Request date: 2/18/2025
Requested by:
Contact: Eric Ohrt
Construction start: 4/28/2025
Construction end: 10/27/2025
Description:
ATTN: ERIC OHRT & MARICEL LLOYD
REPLACE LIED REC SAUNA FOR ISU WRESTLING TEAM
LIED-General-430634-Cement Pad for Dumpster
Project Initiation
Room: General
Request date: 3/31/2025
Requested by:
Contact: Amy Tremain
Construction start: 6/23/2025
Construction end: 12/22/2025
Description:
We have two dumpsters at Lied on the west end of the building. One is on the mulch bedding and looks bad. Can we look at putting in a cement pad down for it to sit on? Is there any way we can mask (hide) that dumpster? I would like an estimate on this cost and thoughts about what could make it look more appealing.
LIED-M0389-405391-Install network cable
Project Closeout
Room: M0389
Request date: 12/2/2024
Requested by:
Contact: Mitchell Hlavacek
Construction start: 3/13/2025
Construction end: 4/23/2025
Description:
ATTN: Steve Larson. As per Garry Greenlee's request: Please install network cable and any other hardware needed for remote access to the newly installed Watt Stopper segment manager in order to view the software and on/off lighting schedules at Lied Rec. Recreation Services also has their own IT support technician, Scott George, who can help with the installation if necessary. Thank you.
LIED-X0130A-415512-Zone Temp Sensors Installed
On Hold
Room: X0130A
Request date: 1/14/2025
Requested by:
Contact: Denise Wulf
Construction start: 3/13/2025
Construction end: 4/23/2025
Description:
Rooms/Spaces: X0130A, X0110A, M0120A, M0120. Would like cost estimate of getting Johnson Controls zone temperature sensors installed in these spaces.