Current Projects in Lloyd Veterinary Medical Center

LLOYD- General-266504-Signage
Bidding
Room: General
Request date: 3/15/2023
Requested by: Marc Kinsley
Contact: Josef Biechler
Construction start: 4/26/2024
Construction end: 10/25/2024
Description:
Improving signage for the Lloyd veterinary medical center 1. the signs along the right hand side of Riverside Drive-the first sign displaying where to turn for small animal hospital is located too close to the entry of the employee parking lot leading to a number of client complaints that the signs are not clear - is it possible to move this sign further up riverside drive closer to the turn to enter the main small animal entrance/client parking? 2. I would like to add a lighted sign to the canopy over the entrance to the small animal hospital. The lighted sign would be similar to the lighted red and white plus sign on S. 16th Street. It would be a square, lighted with the red Plus and white background to better identify for owners in an emergency situation where to go.
LLOYD- General-287308-Paddock Fencing
On Hold
Room: General
Request date: 6/15/2023
Requested by: Marc Kinsley
Contact: Melissa Warg
Construction start: 4/26/2024
Construction end: 10/25/2024
Description:
I would like to evaluate the placement of paddock fencing for housing teaching horses in the grassy area between the highway and vet med. would need to separate into 2-3 pastures, have auto waterer access if possible. Would need help in the design/layout
LLOYD-1273-315704-Replace Water Heater
Construction
Room: 1273
Request date: 10/4/2023
Requested by: John Netwal
Contact: Eric Ohrt
Construction start: 1/25/2024
Construction end: 7/25/2024
Description:
Replace Leaking Hot Water Heater
LLOYD-1304-290612-Temperature Regulation
Schematic Design
Room: 1304
Request date: 6/29/2023
Requested by: Amy Tremain
Contact: Donna Imhoff
Construction start: 7/15/2024
Construction end: 1/13/2025
Description:
Too Hot in Isolation Stall 3 Attn Mike McCoy - sent from FPM shops
LLOYD-1818-317199-Remove Built-in Add Electrical
Project Closeout
Room: 1818
Request date: 10/24/2023
Requested by: Marc Kinsley
Contact: Josef Biechler
Construction start: 1/17/2024
Construction end: 4/15/2024
Description:
need to remove glass cabinet and cabinets below +/- add and electrical outlet if one does not already exist
LLOYD-2221-356100-Furniture
Schematic Design
Room: 2221
Request date: 4/17/2024
Requested by: Amber Tinta
Contact: Rebecca Cantrall
Construction start: 7/15/2024
Construction end: 1/13/2025
Description:
*9ft x 2ft rectangle table (can look at 2 tables to put together - 5ft x 2ft and 4ft x 2ft as other options as well) *10 chairs Brian Adams in our building has already done the measurements. We are looking for pricing estimates/table options to choose from.
LLOYD-2424-348692-Grad Office Remodel
Budget Approval
Room: 2424
Request date: 3/11/2024
Requested by: Jennifer Faber
Contact: Melissa Warg
Construction start: 5/17/2024
Construction end: 11/15/2024
Description:
Due to the increased demand for desk space for VDPAM graduate assistants we would like to convert 2424 Lloyd from a single faculty office to a graduate office with 5 desk spaces. This office will be configured/set up like our previous project in 2428 Lloyd.