Current Projects in Mackay Hall

MACKAY- General-315568-Move Faculty and Program Space
Construction Documents
Room: General
Request date: 10/2/2023
Requested by: Jennifer Plagman-Galvin
Contact: Stephanie Hosier
Construction start: 6/25/2024
Construction end: 12/24/2024
Description:
ATTN Leigh Wiand and Stephanie Hosier Small move of faculty/program space for Event Management. Involves moving faculty in offices 11, 11A, 12 and 309. After faculty moves "The Meeting Room: (technology learning lab) for the Event Mgmt. program) will move to 11 MacKay.
MACKAY-0006-323801-Furniture
Project Closeout
Room: 0006
Request date: 11/16/2023
Requested by: SoJung Lee
Contact: Melissa Warg
Construction start:
Construction end:
Description:
Need a standing desk, conference table, and cabinets.
MACKAY-0018B-342441-Carpet and Paint
Construction
Room: 0018B
Request date: 2/15/2024
Requested by: Jennifer Plagman-Galvin
Contact: Brady Streit
Construction start: 4/29/2024
Construction end: 10/28/2024
Description:
18B needs needs a fresh coat of paint (paint already available in the space from corridor project). Some wall patching necessary. Carpet squares (already purchased) need installed.
MACKAY-0019-301417-Paint Public Corridor
Project Closeout
Room: 0019
Request date: 8/8/2023
Requested by: Jennifer Plagman-Galvin
Contact: Brady Streit
Construction start:
Construction end:
Description:
Paint ground level public corridor from main entrance of the Tearoom, around the hallway heading west to the 001 MacKay classroom.
MACKAY-0101-279382-Relocate DATS Lab
Construction
Room: 0101
Request date: 5/3/2023
Requested by: Jennifer Plagman-Galvin
Contact: Brady Streit
Construction start: 10/18/2023
Construction end: 5/4/2024
Description:
Move DATS Lab and The Meeting Room from LeBaron (105210551057) to 101 MacKay.
MACKAY-0104-315929-Relocation from LeBaron
Construction Documents
Room: 0104
Request date: 10/6/2023
Requested by: Jennifer Plagman-Galvin
Contact: Stephanie Hosier
Construction start: 6/25/2024
Construction end: 12/24/2024
Description:
ATTN: Stephanie Hosier and Leigh Wiand Move faculty from various LeBaron locations to the first floor, west wing, of MacKay in preparation for the LeBaron rebuild project.
MACKAY-0114-357000-Carpet Removal
Budget Approval
Room: 0114
Request date: 4/28/2024
Requested by: Jennifer Plagman-Galvin
Contact: Melissa Warg
Construction start: 5/27/2024
Construction end: 11/25/2024
Description:
Remove carpet and glue from room 0114
MACKAY-0131-356862-Cubicle Walls
Construction Documents
Room: 0131
Request date: 4/25/2024
Requested by: Clayton Johnson
Contact: Carrie Choudhury
Construction start: 7/7/2024
Construction end: 1/5/2025
Description:
Extend walls of existing cubical to provide more privacy and sound dampening (recommended by Human Resources Accommodations office)
MACKAY-0200-355426-Floor Replacement
Schematic Design
Room: 0200
Request date: 4/10/2024
Requested by: Erica Beirman
Contact: Eric Ohrt
Construction start: 7/23/2024
Construction end: 1/21/2025
Description:
Room 200 floor replacement---we would like to have an estimate if the terrazzo is able to be refinished in that lab. If not we would like estimate to replace with the flooring that was used last summer in teh floor for room 210 lab. Would like the project finished before August 1st if possible.
MACKAY-0220C-342653-Remodel
Project Closeout
Room: 0220C
Request date: 2/16/2024
Requested by: Deanna Powell
Contact: Brady Streit
Construction start:
Construction end:
Description:
We need some shelves and a whiteboard taken down, and then the walls patched and repainted as needed in MacKay 220C. Please let us know what other info you'll need for this job
MACKAY-General-335463-College of Human Sciences Space Planning
On Hold
Room: General
Request date: 1/11/2024
Requested by: Jennifer Plagman-Galvin
Contact: Melissa Warg
Construction start:
Construction end:
Description:
CHS Post-LeBaron space planning including use of space in MacKay, HNSB, FSB and Forker. Corinne Good should be lead on this project.