Current Projects in Meats Laboratory (New)
Meats Laboratory-Cooler-Repairs
CP1175478
Initiated date: 8/7/2023
Contact: Jennifer Evans
Description:
This project includes, but is not limited to, the repair of walls (exterior and interior) and ceiling surfaces of three cooler rooms at the Meats Laboratory. Removal of damaged, wet material will expose interior wall conditions and help to locate areas of air leakage. Repairs will be made to prevent moisture build-up. New lighting, insulated walls, and insulated ceiling panels will be installed. The project also includes the demolition and removal of the concrete cooler room floors. New concrete floors, with appropriate insulation beneath, will be installed.