Current Projects in Memorial Union
Memorial Union-Fountain of the Four Seasons-Renovation
CP1017470
Initiated date: 9/7/2022
Contact: Mitchell Hlavacek
Description:
This project includes, but is not limited to, the renovation of the pool basin, fountainhead well, mechanical pit, tunnel, pool lighting, and upgrades to the mechanical and electrical systems of the Fountain of the Four Seasons at the exterior north courtyard of the Memorial Union. The original limestone sculptures of the four maidens will be removed, conserved, and replicated. The sculpture replications will be placed at the original site within the renovated fountain. The original sculptures will be placed in a location to be determined by the University Museums.
Memorial Union-Facility Assessment-Study
CP1173564
Initiated date: 11/30/2023
Contact: Daniel Sloan
Description:
This Study includes, but is not limited to, the exploration of a new parking ramp with an optional boutique hotel, an additional ballroom, and an 800-1000 seat theater attached to the Memorial Union. It also includes a condition assessment of the existing parking ramp.
Memorial Union-Room 2576A Remodel
PR1272106
Initiated date: 9/16/2025
Contact: Amy Tremain
Description:
I have been working with Dan Sloan and Wes Gee in the Architects office on the build out of space 2576A in the Memorial Union for Members 1st. Please route this request to Dan Sloan.