Current Projects in Pearson Hall

PEARSON- General-300386-Plaza Repair
Schematic Design
Room: General
Request date: 8/1/2023
Requested by: John Netwal
Contact: Joseph Stoberl
Construction start: 7/18/2024
Construction end: 1/16/2025
Description:
Pearson/Student Services: Plaza Repair MIC Approved $10,000 FY23 $60,750 FY25
PEARSON-1137-266859-Remodel
Project Closeout
Room: 1137
Request date: 3/20/2023
Requested by: Michelle Soupir
Contact: Jennifer Warrick
Construction start: 9/14/2023
Construction end: 11/24/2023
Description:
The Graduate College is in need of additional office space for new staff hires. We are considering both a re-design of existing space including 1137 and 1156 Pearson, We also could consider other space on campus that might be available.
PEARSON-1156 & 1114-342328-Door Signs
Construction Documents
Room: 1156
Request date: 2/12/2024
Requested by: Alberto Lara
Contact: Joseph Stoberl
Construction start: 5/24/2024
Construction end: 11/22/2024
Description:
We are needing a new door sign for Pearson 1156 that says "McNair Program" We are wanting to order a new door sign for Pearson 1114 that says, "Preparing Future Faculty". Would it be possible to have it changed to read: 1114 Preparing Future Faculty
PEARSON-3102B-356496-Furniture and Lighting
Project Initiation
Room: 3102B
Request date: 4/24/2024
Requested by: Megan Myers
Contact: Jennifer Warrick
Construction start: 8/2/2024
Construction end: 1/31/2025
Description:
cost range estimate for two sitting chairs for Department Chair office in Pearson 3102B (more comfortable chair type as opposed to chairs that sit up next to a table, etc.) AND for large table and chairs for departmental meeting room/copy room, Pearson 3102D (where people might sit to collaborate/eat lunch, drink coffee, etc.; should comfortable seat 6-8 but not be a huge table). I would also like to see a cost range for new lighting, blinds, and clock in the Chair office (Pearson 3102B). Thank you!